Mar 18, 2010 Calorimetry

From GlueXWiki
Revision as of 10:36, 18 March 2010 by Zisis (Talk | contribs) (Tentative Agenda)

Jump to: navigation, search

Teleconference Time: 11:00 a.m. EST

  • ESNET and EVO session
  • Phone in CC F326 is 757-269-6337
  • Phone in the Regina Videoconference Suite is 306-585-4204
  • Phone only if requested:
    • +1-800-377-8846 : US
    • +1-888-276-7715 : Canada
    • +1-302-709-8424 : International
    • then enter participant code: 77438230# (remember the "#"). Phone line by request only.

Items for followup from previous meeting(s)

  1. Monitoring
    • Matt to coordinate with Christina on the shipment of glass blocks and pmts/dividers for monitoring system test.
    • Bcal: Testing to see if LED sources can be viewed by pmts on both sides of the module (UofR).
  2. Fcal
    • Decision on rad hard detectors
    • Check instability of FEU-84 pmt gains / finalize number / order additional FEU-84 pmts

Documents to Review

Tentative Agenda

  1. Announcements
  2. Review of Action Items
  3. Calibration/Monitoring Media:Cal-18-3-09-ath.ppt
  4. FCAL
    • Construction status
    • Proceed with order of FEU-84 pmts?
    • To shashlyk or not to shashlyk
  5. BCAL
  6. Simulations
  7. Other Updates

Minutes

Attendees:

  1. BCAL
    1. Construction status
      1. Module 05 is up to 170 layers, Module 06 up to 130 layers.
      2. By March 24 Module 04 will be finished at RMS and so will be the go-no-go gauge for the alignment pins.
      3. On March 27 (Saturday) we are going to RMS to carry out the transmission uniformity tests for Modules 02-04 and go over all travellers.
      4. We hope to ship the modules to JLab just before or right after Easter weekend.
    2. Fibre tests (Shipment 10) are proceeding nominally.
    3. Lead tally is done, we need a teleconference (JLab-Regina) to decide on the quantity of lead for the last shipment and other logistics.