Difference between revisions of "July 5, 2016, Analysis Working Group"

From GlueXWiki
Jump to: navigation, search
(Agenda)
Line 18: Line 18:
 
#* First run block: 11347-11555 (complete)
 
#* First run block: 11347-11555 (complete)
 
#* Second run block: 11556-11678 (complete)
 
#* Second run block: 11556-11678 (complete)
#* Third run block: 10331-10913 (started)
+
#* Third run block: 10331-10913 (almost complete)
 +
#* Fourth run block: 11059-11346 (ready to start?)
 
#* [[PrivateWiki:Spring_2016_Dataset_Summary#Full_REST_Production|File tracking summary]]
 
#* [[PrivateWiki:Spring_2016_Dataset_Summary#Full_REST_Production|File tracking summary]]
# REST Production Preparations:
+
# [https://halldweb.jlab.org/wiki/index.php/June_29,_2016_Calibration#Calibrations_for_Second_Production_Run Future REST production calibrations]
#* Spring 2016 [[PrivateWiki:Spring_2016_Dataset_Summary|Dataset Summary]] and [[Spring_2016_Trigger_Summary|Trigger Summary]]:
+
#* Fourth run block: 11059-11346
+
#* [https://halldweb.jlab.org/wiki/index.php/Spring_2016_Recon_Checklist#To_do_for_3rd_.26_4th_Priority_Run_Batches Calibrations and detector group status reports]
+
 
# Reconstruction Studies:
 
# Reconstruction Studies:
 +
#* [https://mailman.jlab.org/pipermail/halld-physics/2016-June/000698.html Schedule of presentations]
 
#* CDC Efficiency: Mike
 
#* CDC Efficiency: Mike
 
#* FDC Efficiency: Alex A.
 
#* FDC Efficiency: Alex A.
Line 41: Line 40:
 
#* [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=3076 A summary of rho beam asymmetry data] Curtis
 
#* [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=3076 A summary of rho beam asymmetry data] Curtis
 
#* Triggering Efficiency: Alex S., Justin, Elton
 
#* Triggering Efficiency: Alex S., Justin, Elton
#* [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=3074 Beam Polarization: Justin, Mike, Nathan]
+
#* Beam Polarization: Justin, Mike, Nathan
 
#* Flux: Justin
 
#* Flux: Justin
 
# Analysis Launch Preparations:
 
# Analysis Launch Preparations:

Revision as of 07:20, 5 July 2016

_TOC__

Meeting Time and Place

The meeting will be on Tuesday July 5, 2016 at 1:30 pm EDT. For those people at Jefferson Lab, the meeting will be in room F326.

Meeting Connections

  1. To join via a Web Browser, go to the page [1] https://bluejeans.com/115815824.
  2. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 115815824.
  3. To join via phone, use one of the following numbers and the Conference ID: 115815824.
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. More information on connecting to bluejeans is available.

Agenda

  1. Announcements
  2. REST Production Status:
    • First run block: 11347-11555 (complete)
    • Second run block: 11556-11678 (complete)
    • Third run block: 10331-10913 (almost complete)
    • Fourth run block: 11059-11346 (ready to start?)
    • File tracking summary
  3. Future REST production calibrations
  4. Reconstruction Studies:
    • Schedule of presentations
    • CDC Efficiency: Mike
    • FDC Efficiency: Alex A.
    • FDC Reconstruction: Alex A.
    • BCAL Shower Clustering: Will
    • BCAL Hadronic Energy & Efficiency: Elton
    • BCAL Neutral Energy & Efficiency: Will
    • FCAL Shower Clustering: Matt
    • FCAL Hadronic Energy & Efficiency: Matt
    • FCAL Neutral Energy & Efficiency: Jon
    • SC Efficiency: Mahmoud
    • TOF Efficiency: Beni
    • Tracking Means, Resolution, & Efficiency: Paul, Simon
    • Beam Energy Scale: Nathan, Richard
  5. Other Studies:
  6. Analysis Launch Preparations:
  7. AOB