Jan 12, 2017 Calorimeter

From GlueXWiki
Revision as of 12:34, 12 January 2017 by Elton (Talk | contribs)

Jump to: navigation, search

Video Conferencing Information

Meeting Time: 10:00 a.m.

  1. To join via a Web Browser, go to the page [1] https://bluejeans.com/907185247.
  2. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 907185247.
  3. To join via phone, use one of the following numbers and the Conference ID: 907185247.
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. Upon connection all microphones are automatically muted. To unmute your mike on a Polycom or equivalent unit, enter *4. Unmuting on a computer is trivial as there is a microphone button than can be clicked.
  5. More information on connecting to bluejeans is available.

Participant Direct Lines

  • JLab Phone in CC L207 is 757-269-7084 (usual room)
  • JLab Phone: in CC F326 is 757-269-6460
  • Phone in the Regina Video-conference Suite is 306-585-4204
  • Athens Phone: in Christina's office is 011-30-210-727-6947

Action Items

References

  1. FCAL HDFCAL log book
  2. BCAL HDBCAL log book
  3. BCAL Action Items and Working Tasks

Tentative Agenda

  1. Announcements
  2. Action Items
  3. Run preparations
  4. FCAL update
  5. BCAL update
    • LED monitoring (Ahmed)
  6. Calibrations
    • BCAL Gain calibration (Will)
  7. Reconstruction and Simulation
  8. NIM articles
  9. Any other business

Minutes

Attendees: Adesh, Marc, Elton, Jon (JLab); Zisis, Ahmed, Andrei (UofR); Matt (IU); Christina, George (Athens); Will (CMU)

  1. Announcements
    • First meeting of the year!
    • Spring run starts in about 2 weeks.
    • Update on Lustre system: [info from Mark Ito]: Five disk servers (out of about 50-100) failed on Dec 31. Two have been recovered. Three remain down and Intel engineers are working to get them back. Files are spread over the entire disk system, so the impact of the proportionally larger than might be expected. The files themselves are thought to be ok so fixing the servers should restore the files. Unfortunately the fixes are labor intensive and will possibly take weeks.
  2. Action Items
  3. Run preparations
    • HCO checklist will be downgraded to 'not ready' in preparation for new run.
  4. BCAL update
    • LED monitoring (Ahmed)
    • Checking 2016 fall run 21844. Does not look stable.
    • Lustre system has been down and access to files difficult.
  5. Calibrations
    • BCAL Gain calibration (Will)
  6. Reconstruction and Simulation
  7. FCAL update
  8. NIM articles
  9. Any other business