Line 7: Line 7:
 
* Simulations/Analysis
 
* Simulations/Analysis
 
* Preparation of parts for FCAL2 modules -- Sasha
 
* Preparation of parts for FCAL2 modules -- Sasha
 +
** Received 100 PMTs (the last batch) [https://halldweb.jlab.org/wiki-private/index.php/PMT_for_FCAL_insert]
 +
*** All PMTs have been checked (measured diameter)
 +
*** 39 PMTs were exchanged with the NPS (they are slightly tight)
 
**[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/wrapped/wrapped_crytur.pdf Wrapped CRYTUR crystals: 707 (15 since last week) ]  
 
**[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/wrapped/wrapped_crytur.pdf Wrapped CRYTUR crystals: 707 (15 since last week) ]  
 
*** - Available for wrapping: 722 - 707 = 15  
 
*** - Available for wrapping: 722 - 707 = 15  

Revision as of 10:43, 30 September 2022

Meeting time and location:

  • 9:30 am EST (JLab time) remote only
  • Zoom meeting ID: 161 050 9142 Passcode: 004965

Agenda

  • Simulations/Analysis
  • Preparation of parts for FCAL2 modules -- Sasha
    • Received 100 PMTs (the last batch) [1]
      • All PMTs have been checked (measured diameter)
      • 39 PMTs were exchanged with the NPS (they are slightly tight)
    • Wrapped CRYTUR crystals: 707 (15 since last week)
      • - Available for wrapping: 722 - 707 = 15
      • - DSG group continues wrapping
  • Module fabrication -- Sasha
  • Updates from the FCAL installation meetings with Tim's group -- Sasha
  • Light Monitoring System -- Arshak