Difference between revisions of "JEF meeting, September 16, 2022"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
Line 12: Line 12:
 
**[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/part_preparation.pdf Preparation of parts]
 
**[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/part_preparation.pdf Preparation of parts]
 
**[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/wrapped/wrapped_crytur.pdf Wrapped CRYTUR crystals:] 687
 
**[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/wrapped/wrapped_crytur.pdf Wrapped CRYTUR crystals:] 687
+
*** - Available for wrapping: 722 - 687 = 35
*** Available for wrapping:  
+
*** - DSG group continues wrapping
** Meeting with the DSG group: Mindy and George will continue working on the project in September
+
 
* Module fabrication  -- Sasha
 
* Module fabrication  -- Sasha
 
** Received 72 + 76 PMT housings from Tim
 
** Received 72 + 76 PMT housings from Tim

Revision as of 08:41, 16 September 2022

Meeting time and location:

  • 9:30 am EST (JLab time) remote only
  • Zoom meeting ID: 161 050 9142 Passcode: 004965

Agenda


  • Preparation of parts for FCAL2 modules -- Sasha
  • Module fabrication -- Sasha
  • Light Monitoring System -- Arshak