*** [https://halldweb.jlab.org/wiki/index.php/CRYTUR 45 CRYTUR crystals received from Physics division] | *** [https://halldweb.jlab.org/wiki/index.php/CRYTUR 45 CRYTUR crystals received from Physics division] | ||
*** currently available/ordered + CCAL: 1593 + (9) + 20 (recent order) = 1622 (may need to order more spares (?) ) | *** currently available/ordered + CCAL: 1593 + (9) + 20 (recent order) = 1622 (may need to order more spares (?) ) | ||
− | **[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/part_preparation.pdf Preparation of parts] | + | **[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/part_preparation.pdf Preparation of parts] |
− | + | ||
− | + | ||
− | + | ||
**[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/wrapped/wrapped_crytur.pdf Wrapped CRYTUR crystals:] 682 | **[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/wrapped/wrapped_crytur.pdf Wrapped CRYTUR crystals:] 682 | ||
*** <span style="color:#FF0000"> All currently available </span> | *** <span style="color:#FF0000"> All currently available </span> |
Revision as of 08:37, 16 September 2022
Meeting time and location:
- 9:30 am EST (JLab time) remote only
- Zoom meeting ID: 161 050 9142 Passcode: 004965
Agenda
- Simulations/Analysis
- Preparation of parts for FCAL2 modules -- Sasha
- Crystals.
- 45 CRYTUR crystals received from Physics division
- currently available/ordered + CCAL: 1593 + (9) + 20 (recent order) = 1622 (may need to order more spares (?) )
- Preparation of parts
- Crystals.
- Wrapped CRYTUR crystals: 682
- All currently available
- Meeting with the DSG group: Mindy and George will continue working on the project in September
- Wrapped CRYTUR crystals: 682
- Module fabrication -- Sasha
- Received 72 + 76 PMT housings from Tim
- Status of fabrication
- Fabricated modules: Total 1206 (a new milestone)
- All SICCAS 576 SICCAS
- 630 CRYTUR, Remaining: 52
- Clean room EEL126 [1][2]
- Expect to move to the new lab EEL108 (the same building) [3]
- Work on amending safety docs
- All students will leave during this week (11 students have been working on the project during this summer)
- Great job !
- (had also a chance to work on the CCAL project [4])
- Updates from the FCAL installation meetings with Tim's group -- Sasha
- Preparation of parts for FCAL2 modules -- Sasha
- Module fabrication -- Sasha
- Light Monitoring System -- Arshak