JEF meeting, May 3, 2024
From GlueXWiki
Media:Example.oggMeeting time and location:
- 9:30 am EST (JLab time) remote only
- Connection information
- Preparation of parts for ECAL -- Sasha
- - signal cables - done
- - signal patch panel [1] - done
- - HV short cables: received, checked, labeled (last week)
- - HV long cable, 18 ready (out of 36)
- - HV distribution boards: in preparation
- - LV cables: waiting for about 160 cables (will need to test, label, and bundle)
- - LV distribution boards [2]. Have to populate with connectors, and design a box around the PCB
- - Chris S. is working on the prototype of the LED board. Currently 5 blue LEDs, consider to add red LEDs as well
- Ongoing projects
- Testing of PMT dividers -- Sasha / Vlad / George / Mindy
- Installation of the FCAL2 detector & integration to GlueX -- Sasha / Vlad / Hakob / Laveen
- Installation of the LMS has been completed [6]
- Installation and testing cables and dividers [7][8]
- All crates are connected to the network switch Ethernet switch [9]
- Preparing for testing installed dividers
- Detector installation page
- Preparation for beam tests with the PS
- measure shower beam profile
- shower reconstruction between PbWO4 and LG
- Other hardware projects
- --prototype of the ECAL veto counter
- --study shower profile using PS (also transition region between lead tungstate and LG modules (?) )
- FCAL2 poster for open house?
- JEF/ECAL/FCAL poster
- Analysis/Simulation
- eta to ggpi0's update -- ig