Difference between revisions of "JEF meeting, March 15, 2024"
From GlueXWiki
(→Agenda) |
|||
Line 11: | Line 11: | ||
** - HV long cable, 18 ready (out of 36) | ** - HV long cable, 18 ready (out of 36) | ||
** - HV distribution boards: in preparation | ** - HV distribution boards: in preparation | ||
− | ** - LV cables: | + | ** - LV cables: 100 cables received, 500 cables in total |
** - LV distribution boards [https://halldweb.jlab.org/detectors/fcal2/cables/lv_distribution/lv_dist_board.jpg ]. Have to populate with connectors, and design a box around the PCB | ** - LV distribution boards [https://halldweb.jlab.org/detectors/fcal2/cables/lv_distribution/lv_dist_board.jpg ]. Have to populate with connectors, and design a box around the PCB | ||
* '''Ongoing projects''' -- Sasha, all | * '''Ongoing projects''' -- Sasha, all |
Revision as of 09:04, 15 March 2024
Meeting time and location:
- 9:30 am EST (JLab time) remote only
- Connection information
Agenda
- Preparation of parts for ECAL -- Sasha
- - signal cables - done
- - signal patch panel [1] - done
- - HV short cables: received, checked, labeled (last week)
- - HV long cable, 18 ready (out of 36)
- - HV distribution boards: in preparation
- - LV cables: 100 cables received, 500 cables in total
- - LV distribution boards [2]. Have to populate with connectors, and design a box around the PCB
- Ongoing projects -- Sasha, all
- - Tested and labeled all HV cables ! and about 100 LV cables -- Laveen
- Testing of PMT dividers -- Sasha / Vlad / George
- Installation of the FCAL2 detector & integration to GlueX -- Sasha / Vlad / Hakob / Laveen
- Analysis/Simulation