Line 13: | Line 13: | ||
** - LV cables: 100 cables received, 500 cables in total | ** - LV cables: 100 cables received, 500 cables in total | ||
** - LV distribution boards [https://halldweb.jlab.org/detectors/fcal2/cables/lv_distribution/lv_dist_board.jpg ]. Have to populate with connectors, and design a box around the PCB | ** - LV distribution boards [https://halldweb.jlab.org/detectors/fcal2/cables/lv_distribution/lv_dist_board.jpg ]. Have to populate with connectors, and design a box around the PCB | ||
− | * '''Ongoing projects''' -- Sasha | + | * '''Ongoing projects''' -- Sasha / Vlad / Hakob / Laveen |
− | ** - Tested and labeled all HV cables ! and about 100 LV cables | + | ** - Tested and labeled all HV cables ! and about 100 LV cables |
− | ** - Bundling short cables | + | ** - Bundling short cables (groups of 7, 7, and 6) |
− | **: | + | *** finished: LV - 7 layers, HV - 17 layers, signal - 4 layers |
* '''[[Testing of PMT dividers]]''' -- Sasha / Vlad / George | * '''[[Testing of PMT dividers]]''' -- Sasha / Vlad / George | ||
** - Testing procedure [https://halldweb.jlab.org/detectors/fcal2/dividers/divider_test_guide.pptx] | ** - Testing procedure [https://halldweb.jlab.org/detectors/fcal2/dividers/divider_test_guide.pptx] |
Revision as of 09:16, 15 March 2024
Meeting time and location:
- 9:30 am EST (JLab time) remote only
- Connection information
Agenda
- Preparation of parts for ECAL -- Sasha
- - signal cables - done
- - signal patch panel [1] - done
- - HV short cables: received, checked, labeled (last week)
- - HV long cable, 18 ready (out of 36)
- - HV distribution boards: in preparation
- - LV cables: 100 cables received, 500 cables in total
- - LV distribution boards [2]. Have to populate with connectors, and design a box around the PCB
- Ongoing projects -- Sasha / Vlad / Hakob / Laveen
- - Tested and labeled all HV cables ! and about 100 LV cables
- - Bundling short cables (groups of 7, 7, and 6)
- finished: LV - 7 layers, HV - 17 layers, signal - 4 layers
- Testing of PMT dividers -- Sasha / Vlad / George
- Installation of the FCAL2 detector & integration to GlueX -- Sasha / Vlad / Hakob / Laveen
- Analysis/Simulation