Difference between revisions of "JEF meeting, June 11, 2021"
From GlueXWiki
m (→Minutes) |
|||
(3 intermediate revisions by 2 users not shown) | |||
Line 27: | Line 27: | ||
** GlueX-I eta yield estimates (Jon) [https://halldweb.jlab.org/wiki/index.php/File:JEF_EtaYieldEstimates_6_11_21.pdf] | ** GlueX-I eta yield estimates (Jon) [https://halldweb.jlab.org/wiki/index.php/File:JEF_EtaYieldEstimates_6_11_21.pdf] | ||
* Simulations | * Simulations | ||
+ | ** [https://halldweb.jlab.org/wiki/images/4/44/Glue-jefxd-igal-jaegle-11062021.pdf S to pipi] | ||
+ | |||
+ | =Minutes= | ||
+ | Attendees: Igal,Jon,Bill,Susan,Sasha,Jared,Azizah,Varun,Liping,Tim W.,Igor,Zisis,S.T. | ||
+ | * Plan to set up follow-up meeting with SICCAS next week(?) after SICCAS meets with one of their vendors | ||
+ | ** No update on crystal delivery | ||
+ | * Sasha has been spending most of his time working on getting COMCAL ready to go for upcoming PrimEx run | ||
+ | ** Almost finished checking PMT dividers: found a few outliers with larger divider current or smaller amplitudes, put aside to be replaced | ||
+ | ** Visually inspected all COMCAL crystals, checking for quality of coupling to PMT (with optical grease) | ||
+ | *** Saw some bubbles, some evidence that grease had dried out | ||
+ | *** For several modules (~20%), reapplied grease and reinstalled -- looks like this improved coupling | ||
+ | *** Question: how long does the optical grease last? | ||
+ | * Progress continues in refurbishment of LMS for COMCAL | ||
+ | ** Fibers to be reinstalled next week | ||
+ | * Fernando making progress on PMT divider/amplifier redesign for FCAL-2, plan to build ~2 prototypes | ||
+ | * Chris A. working on brazing of brass straps | ||
+ | ** Adjusting temperature control -- some evidence of overheating? | ||
+ | ** Flux has to be cleaned off carefully to avoid corrosion | ||
+ | ** Reproduced force analysis | ||
+ | * Liping will send 2 students to JLab for the summer now that lab is in MedCon-4 | ||
+ | * Liping will be hiring postdoc to work on PrimEx/JEF-related efforts | ||
+ | * Jon presented estimates of number of ηs produced in 2γ, π+π-π0, and 3π0 channels for Spring'17 + Spring'18 + Fall'18 data sets | ||
+ | ** Agreement in t-dependence of 3 channels is very good | ||
+ | ** Models tend to overestimate differential cross section | ||
+ | ** Guess for systematic error is ~10% level (differences in 3 channels, luminosity,...) | ||
+ | ** Plan for η cross section publication | ||
+ | * Igal presented a first study for sensitivity to S→π+π- in the channels η→π0S, η'→π0S; η'→ηS | ||
+ | ** Kinematic fit but no mass constraints | ||
+ | ** In data see clear signals for η→π0π+π- and η'→ηπ+π-, but no signal seen in η'→π0π+π- | ||
+ | ** Estimated pdf and efficiency for S in the three search channels |
Latest revision as of 15:36, 11 June 2021
Meeting time and location= 9:00 am EST (JLab time) Bluejeans only
Connection instructions
We are using BlueJeans Video/Audio conferencing. Our meeting ID number is 992533564. Click "Expand" for more details.
- Make sure you have created a BlueJeans account via your JLab CUE account using this link:
- http://jlab.bluejeans.com (You should only need to do this once)
- If connecting via Web Browser: click this link (no passcode is needed):
- If connecting via Phone: Dial one of the following numbers and then enter the meeting ID above and hit "#" or "##"
- Dial: 1 888 240 2560 (US or Canada only)
- or, List of International Numbers
- If connecting via Polycom unit:
- Dial 199.48.152.152 or bjn.vc
- Enter meeting ID above
Agenda
- SICCAS crystals
- Module fabrication
- COMCAL tests, TAC running, etc.
- Data analysis
- GlueX-I eta yield estimates (Jon) [1]
- Simulations
Minutes
Attendees: Igal,Jon,Bill,Susan,Sasha,Jared,Azizah,Varun,Liping,Tim W.,Igor,Zisis,S.T.
- Plan to set up follow-up meeting with SICCAS next week(?) after SICCAS meets with one of their vendors
- No update on crystal delivery
- Sasha has been spending most of his time working on getting COMCAL ready to go for upcoming PrimEx run
- Almost finished checking PMT dividers: found a few outliers with larger divider current or smaller amplitudes, put aside to be replaced
- Visually inspected all COMCAL crystals, checking for quality of coupling to PMT (with optical grease)
- Saw some bubbles, some evidence that grease had dried out
- For several modules (~20%), reapplied grease and reinstalled -- looks like this improved coupling
- Question: how long does the optical grease last?
- Progress continues in refurbishment of LMS for COMCAL
- Fibers to be reinstalled next week
- Fernando making progress on PMT divider/amplifier redesign for FCAL-2, plan to build ~2 prototypes
- Chris A. working on brazing of brass straps
- Adjusting temperature control -- some evidence of overheating?
- Flux has to be cleaned off carefully to avoid corrosion
- Reproduced force analysis
- Liping will send 2 students to JLab for the summer now that lab is in MedCon-4
- Liping will be hiring postdoc to work on PrimEx/JEF-related efforts
- Jon presented estimates of number of ηs produced in 2γ, π+π-π0, and 3π0 channels for Spring'17 + Spring'18 + Fall'18 data sets
- Agreement in t-dependence of 3 channels is very good
- Models tend to overestimate differential cross section
- Guess for systematic error is ~10% level (differences in 3 channels, luminosity,...)
- Plan for η cross section publication
- Igal presented a first study for sensitivity to S→π+π- in the channels η→π0S, η'→π0S; η'→ηS
- Kinematic fit but no mass constraints
- In data see clear signals for η→π0π+π- and η'→ηπ+π-, but no signal seen in η'→π0π+π-
- Estimated pdf and efficiency for S in the three search channels