Difference between revisions of "JEF meeting, January 6, 2022"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
Line 12: Line 12:
 
*** Available for wrapping: 10 CRYTUR crystals
 
*** Available for wrapping: 10 CRYTUR crystals
 
*** Mindy (DSG group) continues wrapping crystals and soldering wires to sockets
 
*** Mindy (DSG group) continues wrapping crystals and soldering wires to sockets
 +
**  Disassembling CCAL
 +
*** CCAL moved to the ESB
 +
*** All modules (with SICCAS crystals) are removed
 
** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/part_preparation.pdf List of available parts]
 
** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/part_preparation.pdf List of available parts]
 
* '''Module fabrication'''  -- Sasha
 
* '''Module fabrication'''  -- Sasha

Revision as of 00:08, 6 January 2023

Meeting time and location:

  • 9:30 am EST (JLab time) remote only
  • Zoom meeting ID: 161 050 9142 Passcode: 004965

Agenda