JEF meeting, February 16, 2024

From GlueXWiki
Jump to: navigation, search

Meeting time and location:


Agenda

  • Preparation of parts for ECAL -- Sasha
    • - signal cables - done
    • - signal patch panel [1] - done
    • - HV cables: received 165 cables 1445 in total
    • - HV distribution boards: in preparation
    • - LV cables: 100 cables received, 250 cables in total
    • - LV distribution boards. Received 4 boards, performed initial cehck, need to solder connectors [2]
    • - Optical fibers and parts for the trigger/DAQ have been ordered
  • Ongoing projects -- Sasha, all
  • Testing of PMT dividers -- Sasha / Vlad / George
    • - Testing procedure [6]
    • - ePASS submitted and approved
    • - George from the DSG continued testing dividers
    • - Have tested 637 + 134 = 771 dividers (about 100 available for testing) [7].
    • - Spare PMTs, have about 20, likely need more for the future (order 30 more )?
  • Installation of the FCAL2 detector & integration to GlueX -- Sasha / Vlad
    • Detector installation [8][9][10]
    • Installation of the LMS
      • 175 fibers installed during this week (488 in total) [11] [12]
    • Cable and divider installation [13][14][15]
    • Still no power on the ECAL platform (expect delay with the development of the trigger/DAQ)
    • Detector installation page
  • Analysis/Simulation

Minutes

Attendees: Sasha, Bill, Igal, Liping, Vlad, Laveen, Zisis, Stjepan, Olga, Susan, Jane, Jon, S.T.

  • Chris S. fabricating dividers, George J. from detector support group testing them (134 last week)
    • ~100 to be tested
    • Fabrication quality improved (only one "bad", already fixed)
  • Expect to use 3x amplier ~10x10 array around beam pipe due to high rate
    • Also plan to run at lower HV than others
  • Cables/dividers installed up to third row from bottom of insert
    • Desigining tool for replacing dividers: laparoscopy grasping forceps
    • Testing dividers in place with HV (make light tight first)
  • LMS installation continues
    • Needed to order face shield due to UV light backsplash
    • Fibers ordered into bundles, clamped and clamps attached to plexiglas
    • Position of integrating sphere to be fixed
    • Some bad fibers identified, moved to side
  • S.T. showed look at simulation of a small inner TOF counter covering the hole not covered by the regular TOF
    • Rates in 1 mm wide strips look manageable
    • Need to check impact of new veto on golden channel
  • Beam test in March: only GEMTRD studies, nothing else turned on
    • Hopefully no significant activation in inner region of insert
  • Igal studying golden channel using low level objects (not DReactionFilter)
    • Chi^2 test to select best candidate per event
    • BCAL veto needed to get rid of ω background
    • TOF veto not as effective as originally thought after TOF bug in simulation found and fixed
    • Working with Daniel L. on machine learning algorithm