Line 8: | Line 8: | ||
** - signal cables: Received all needed long cables. Redid and tested 4 bundles. All cables are ready. | ** - signal cables: Received all needed long cables. Redid and tested 4 bundles. All cables are ready. | ||
** - signal patch panels are ready [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/10_13_2023/signal_patch_panel.jpg ] | ** - signal patch panels are ready [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/10_13_2023/signal_patch_panel.jpg ] | ||
− | ** - HV cables: | + | ** - HV cables: 800 cables are ready for installation. Long cables are in production |
** - HV distribution boards: Chris is finalizing design of the distribution board, should order 4 boards soon. | ** - HV distribution boards: Chris is finalizing design of the distribution board, should order 4 boards soon. | ||
** - LV cables: ordered, lead time unclear | ** - LV cables: ordered, lead time unclear | ||
− | ** - LV distribution boards. The | + | ** - LV distribution boards. The LV distribution boards have been ordered. |
** - Optical fibers: received all | ** - Optical fibers: received all | ||
* '''Ongoing projects''' -- Sasha, all | * '''Ongoing projects''' -- Sasha, all |
Revision as of 10:06, 8 December 2023
Meeting time and location:
- 9:30 am EST (JLab time) remote only
- Connection information
Agenda
- Preparation of parts for ECAL -- Sasha
- - signal cables: Received all needed long cables. Redid and tested 4 bundles. All cables are ready.
- - signal patch panels are ready [1]
- - HV cables: 800 cables are ready for installation. Long cables are in production
- - HV distribution boards: Chris is finalizing design of the distribution board, should order 4 boards soon.
- - LV cables: ordered, lead time unclear
- - LV distribution boards. The LV distribution boards have been ordered.
- - Optical fibers: received all
- Ongoing projects -- Sasha, all
- - Testing and labeling cables (Recently labeled cables in boxes)[2]
- - Prepare modules for the TAC and prototypes (using crystals with some imperfections) [3]
- Wrapped crystals - done
- Parts for TAC[4] - done
- Modules for prototype (25 are ready) - done
- - Preparation of the LMS
- - Summer Students (2023)
- Testing of PMT dividers -- Sasha / Vlad / Aoran / Boaxin
- Installation of the FCAL2 detector & integration to GlueX -- Sasha / Vlad / Hakob
- Detector installation [9][10][11]
- Detector survey
- Detector installation page
- Updates from the meetings with Tim's group [12]
- Meeting with Chris Cuevas regarding installing optical fibers and patch panels
- Preparation of parts for ECAL -- Sasha
- Ongoing projects -- Sasha, all
- - Preparation of the LMS
- Testing of PMT dividers -- Sasha / Vlad / Aoran / Boaxin
- Installation of the FCAL2 detector & integration to GlueX -- Sasha / Vlad / Hakob
- Lead Glass Efforts -- Malte / Mark / Kevin / Zisis
- Analysis/Simulation