Difference between revisions of "JEF meeting, December 8, 2023"
From GlueXWiki
(→Agenda) |
(→Agenda) |
||
Line 35: | Line 35: | ||
** Updates from the meetings with Tim's group [https://halldweb.jlab.org/wiki/index.php/FCAL_2_Design_Meetings] | ** Updates from the meetings with Tim's group [https://halldweb.jlab.org/wiki/index.php/FCAL_2_Design_Meetings] | ||
** Meeting with Chris Cuevas regarding installing optical fibers and patch panels | ** Meeting with Chris Cuevas regarding installing optical fibers and patch panels | ||
+ | ** Installation of electronics [https://halldweb.jlab.org/wiki/index.php/FCAL2_Crates] | ||
* '''[[Lead Glass Efforts]]''' -- Malte / Mark / Kevin / Zisis | * '''[[Lead Glass Efforts]]''' -- Malte / Mark / Kevin / Zisis | ||
*'''Analysis/Simulation''' | *'''Analysis/Simulation''' |
Revision as of 10:15, 8 December 2023
Meeting time and location:
- 9:30 am EST (JLab time) remote only
- Connection information
Agenda
- Preparation of parts for ECAL -- Sasha
- - signal cables: Received all needed long cables. Redid and tested 4 bundles. All cables are ready.
- - signal patch panels are ready [1]
- - HV cables: 800 cables are ready for installation. Long cables are in production
- - HV distribution boards: Chris is finalizing design of the distribution board, should order 4 boards soon.
- - LV cables: ordered, lead time unclear
- - LV distribution boards. The LV distribution boards have been ordered.
- - Optical fibers: received all
- Ongoing projects -- Sasha, all
- - Testing and labeling cables (Recently labeled cables in boxes)[2]
- - Prepare modules for the TAC and prototypes (using crystals with some imperfections) [3]
- Wrapped crystals - done
- Parts for TAC[4] - done
- Modules for prototype (25 are ready) - done
- - Preparation of the LMS
- - All fibers are ready for the installation. The plate was machined and polised [5]
- - Installing light tight covers on the plastic caps.
- - Meeting with Fernando and Chris regarding LED drivers
- - Radiation tests of the PMT active base [6]
- - Summer Students (2023)
- Testing of PMT dividers -- Sasha / Vlad / Aoran
- Installation of the FCAL2 detector & integration to GlueX -- Sasha / Vlad / Hakob
- Detector installation [9][10][11]
- Detector survey
- - waiting for survey results
- Detector installation page
- Updates from the meetings with Tim's group [12]
- Meeting with Chris Cuevas regarding installing optical fibers and patch panels
- Installation of electronics [13]
- Lead Glass Efforts -- Malte / Mark / Kevin / Zisis
- Analysis/Simulation