Difference between revisions of "JEF meeting, December 16, 2022"
From GlueXWiki
(→Agenda) |
(→Agenda) |
||
Line 11: | Line 11: | ||
*** 20 crystals wrapped during last week | *** 20 crystals wrapped during last week | ||
*** Available for wrapping: 10 crystals | *** Available for wrapping: 10 crystals | ||
− | *** Mindy (DSG group) continues wrapping crystals | + | *** Mindy (DSG group) continues wrapping crystals and soldering wires to sockets |
− | + | ||
** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/part_preparation.pdf List of available parts] | ** [https://halldweb.jlab.org/detectors/fcal2/module_fabrication/status/part_preparation.pdf List of available parts] | ||
* '''Module fabrication''' -- Sasha | * '''Module fabrication''' -- Sasha |
Revision as of 10:03, 16 December 2022
Meeting time and location:
- 9:30 am EST (JLab time) remote only
- Zoom meeting ID: 161 050 9142 Passcode: 004965
Agenda
Agenda
- Preparation of parts for FCAL2 modules -- Sasha
- Expect to receive 10 more CRYTUR crystals from physics division (22-C0275) by the end of this year
- Wrapped CRYTUR crystals: 815
- 20 crystals wrapped during last week
- Available for wrapping: 10 crystals
- Mindy (DSG group) continues wrapping crystals and soldering wires to sockets
- List of available parts
- Module fabrication -- Sasha
- Status of fabrication
- Fabricated modules: Total 1371 (9 modules fabricated since last week)
- Testing of PMT dividers -- Sasha / Arshak
- Installation of the FCAL2 detector -- Sasha / Arshak
- Detector installation page
- Updates from the meetings with Tim's group [1]
- Detector cabling and patch panels for the FCAL insert
- Manpower and division of tasks
- Projects for summer students
- Light Monitoring System -- Arshak
- Simulations/Analysis