Difference between revisions of "JEF meeting, December 16, 2022"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
Line 7: Line 7:
  
 
*'''Preparation of parts for FCAL2 modules''' -- Sasha  
 
*'''Preparation of parts for FCAL2 modules''' -- Sasha  
*** Expect to receive 10 more CRYTUR crystals from physics division (22-C0275) by the end of this year
+
** Expect to receive 10 more CRYTUR crystals from physics division (22-C0275) by the end of this year
 
**[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/wrapped/wrapped_crytur.pdf Wrapped CRYTUR crystals: 815 ]  
 
**[https://halldweb.jlab.org/detectors/fcal2/module_fabrication/wrapped/wrapped_crytur.pdf Wrapped CRYTUR crystals: 815 ]  
 
*** 20 crystals wrapped during last week
 
*** 20 crystals wrapped during last week

Revision as of 10:02, 16 December 2022

Meeting time and location:

  • 9:30 am EST (JLab time) remote only
  • Zoom meeting ID: 161 050 9142 Passcode: 004965

Agenda

Agenda