Difference between revisions of "JEF meeting, April 8, 2022"
From GlueXWiki
Line 6: | Line 6: | ||
* Preparation for mass production of FCAL2 modules -- Sasha | * Preparation for mass production of FCAL2 modules -- Sasha | ||
− | ** 60 CRYTUR crystals have been received (and accepted) | + | ** [https://halldweb.jlab.org/wiki/index.php/CRYTUR 60 CRYTUR crystals have been received (and accepted)] |
** 131 SICCAS crystals were moved from the NPS lab. 40 of them have been tested | ** 131 SICCAS crystals were moved from the NPS lab. 40 of them have been tested | ||
* Module fabrication -- Sasha | * Module fabrication -- Sasha |
Revision as of 19:12, 7 April 2022
Meeting time and location
- 9:30 am EST (JLab time) remote only
- Zoom meeting ID: 161 050 9142 Passcode: 004965
Agenda
- Preparation for mass production of FCAL2 modules -- Sasha
- 60 CRYTUR crystals have been received (and accepted)
- 131 SICCAS crystals were moved from the NPS lab. 40 of them have been tested
- Module fabrication -- Sasha
- Light Monitoring System -- Arshak
- COMCAL tests, TAC running, etc. -- Sasha
- Data analysis
- Simulations