GlueX phase 2, 2023-01 data set

From GlueXWiki
Revision as of 09:33, 29 December 2023 by Ijaegle (Talk | contribs) (Timing)

Jump to: navigation, search

List of changes

These lists are giving the run ranges where the FCAL hardware was not changed.

Monitoring results

What is currently in the default variation

Periods

Detailed sub-periods

Min Run Max Run Batch # Gains
120297 120444 1 [1]
120445 120679 2 [2]
120680 120790 3 [3]
120791 120894 4 [4]
120910 121092 5 [5]
121093 121207 6 [6]

Timing

Done for each batches above.

Pedestals

The pedestal calibration is performed for each run.

  • period 0: 120166-120222 (AMO)
  • period 8: 120331-120373 (PERP/PARA - AMO-12036[2-4] Full)
  • perido 10
  • period 20
  • period 39

Gain matching calibration plots

Checking the FCAL gains

Energy dependence correction monitoring plots

Timing calibration

Is based on

  • period 8: 120331-120373 (PERP/PARA - AMO-12036[2-4] Full)

but applied to all 2023-01 data set

Bad block map

This map is done for each run number by combining the info collected by analyzing the LED and pi0 skims.

  • period 0: 120166-120222 (AMO)