GlueX TOF Meeting, July 19, 2012
From GlueXWiki
Thursday, July 19, 2012
10:00 am EDT
JLab: CEBAF Center, F326
Agenda
- Announcements
- Review of last TOF bi-weekly meeting
- Mechanical design
- Prototype status
- TDC choice
- Contract Status
- Calibration and Alignment
- Technical Design Report contribution
Communication
Videoconference
- ESNet: 8542553
- EVO: EVO site
- meeting link
- Phone bridge ID: 13 7104
Slides
Talks can be deposited in the directory /group/halld/www/halldweb1/html/talks/2012-3Q
on the JLab CUE. This directory is accessible from the web at https://halldweb1.jlab.org/talks/2012-3Q/ .
Minutes
Present:
- FSU: Sasha Ostrovidov, Randall Smith, Ian Winger
- JLab: Tim Whitlatch, Beni Zihlmann (chair)
- Internet: Mark Ito
Mechanical Design
- We had an extended detailed discussion of the mechanical design for the mini-TOF, reviewing [??? drawings from Chuck]. JLab will provided the bent brackets, which involve bending of sheet metal.
- We may have to purchase some pieces for the mini-TOF before the construction contract is in place. If so, arrangements may have to be made to have JLab pay for some parts to get started.
- Mark and Tim will review the overall schedule for this part of the 12-GeV/Hall-D project and make a distilled version so that all involved can see where we are. Things are starting to look a bit tight.