==Mechanical Design==
 
==Mechanical Design==
  
We had an extended detailed discussion of the mechanical design, reviewing [??? drawings from Chuck].
+
* We had an extended detailed discussion of the mechanical design for the mini-TOF, reviewing [??? drawings from Chuck]. JLab will provided the bent brackets, which involve bending of sheet metal.
 +
* We may have to purchase some pieces for the mini-TOF before the construction contract is in place. If so, arrangements may have to be made to have JLab pay for some parts to get started.
 +
* Mark and Tim will review the overall schedule for this part of the 12-GeV/Hall-D project and make a distilled version so that all involved can see where we are. Things are starting to look a bit tight.

Revision as of 11:44, 19 July 2012

Thursday, July 19, 2012
10:00 am EDT
JLab: CEBAF Center, F326

Agenda

  1. Announcements
  2. Review of last TOF bi-weekly meeting
  3. Mechanical design
  4. Prototype status
  5. TDC choice
  6. Contract Status
  7. Calibration and Alignment
  8. Technical Design Report contribution

Communication

Videoconference

  1. ESNet: 8542553
  2. EVO: EVO site

Slides

Talks can be deposited in the directory /group/halld/www/halldweb1/html/talks/2012-3Q on the JLab CUE. This directory is accessible from the web at https://halldweb1.jlab.org/talks/2012-3Q/ .

Minutes

Present:

  • FSU: Sasha Ostrovidov, Randall Smith, Ian Winger
  • JLab: Tim Whitlatch, Beni Zihlmann (chair)
  • Internet: Mark Ito

Mechanical Design

  • We had an extended detailed discussion of the mechanical design for the mini-TOF, reviewing [??? drawings from Chuck]. JLab will provided the bent brackets, which involve bending of sheet metal.
  • We may have to purchase some pieces for the mini-TOF before the construction contract is in place. If so, arrangements may have to be made to have JLab pay for some parts to get started.
  • Mark and Tim will review the overall schedule for this part of the 12-GeV/Hall-D project and make a distilled version so that all involved can see where we are. Things are starting to look a bit tight.