Difference between revisions of "GlueX TOF Meeting, August 30, 2012"

From GlueXWiki
Jump to: navigation, search
(notes as minutes)
(headings)
Line 30: Line 30:
 
=Minutes=
 
=Minutes=
  
TOF meeting notes, Aug. 30
+
Present:
 +
* '''FSU''': Paul Eugenio, Sasha Ostrovidov, Randall Smith, Ian Winger
 +
* '''JLab''': Fernando Barbosa, Mark Ito (chair), Tim Whitlatch, Beni Zihlmann
  
ian, sasha, randall, paul
+
=Re-cap of Last Meeting=
tim, mark, beni, fernando
+
  
last time
+
Paul summarized items discussed at the last meeting, on August 16.
short discussion of items purchased
+
 
update of mini-tof
+
* There was a short discussion of items purchased
discussion of changing materials due to length and weight
+
* FSU gave an update on mini-TOF construction
send out calibration document
+
* There was discussion of changing materials due to length and weight.
 +
* Sasha presented ideas on calibration.
 +
 
 +
==Electronics==
  
 
TDCs have been ordered
 
TDCs have been ordered
Line 52: Line 56:
 
late oct, modules via umass should arrive
 
late oct, modules via umass should arrive
  
mini-tof update
+
==Mini-TOF Update==
  
 
Randall
 
Randall
Line 64: Line 68:
 
all light guides manufactured
 
all light guides manufactured
 
more material requested
 
more material requested
 +
mark will order
  
 
paul and ian will meet on glueing fixture for 5 paddles at once
 
paul and ian will meet on glueing fixture for 5 paddles at once
 
box of plates delivered to old central receiving
 
box of plates delivered to old central receiving
 +
 +
==Contract Status==
 +
 +
==Calibration and Alignment==
 +
 +
A new version of the calibration document will be distributed shortly.
 +
 +
==Technical Design Report Contribution==

Revision as of 11:31, 30 August 2012

GlueX TOF Meeting
Thursday, August 30, 2012
10:00 am EDT
JLab: CEBAF Center, F326

Agenda

  1. Announcements
  2. Review of last TOF bi-weekly meeting
  3. Mechanical design
  4. Prototype status
  5. TDC Purchase
  6. Contract Status
  7. Calibration and Alignment
  8. Technical Design Report contribution

Communication

Videoconference

  1. ESNet: 8542553
  2. EVO: EVO site

Slides

Talks can be deposited in the directory /group/halld/www/halldweb1/html/talks/2012-3Q on the JLab CUE. This directory is accessible from the web at https://halldweb1.jlab.org/talks/2012-3Q/ .

Minutes

Present:

  • FSU: Paul Eugenio, Sasha Ostrovidov, Randall Smith, Ian Winger
  • JLab: Fernando Barbosa, Mark Ito (chair), Tim Whitlatch, Beni Zihlmann

Re-cap of Last Meeting

Paul summarized items discussed at the last meeting, on August 16.

  • There was a short discussion of items purchased
  • FSU gave an update on mini-TOF construction
  • There was discussion of changing materials due to length and weight.
  • Sasha presented ideas on calibration.

Electronics

TDCs have been ordered signal distribution issues need to be planned, additional modules need to be built by us hall b has prototypes, sergey thinks they will need a new design

gaining experience with flash ADC's FSU has VME 64x crate, pin removed for serial connector must use internal clock or provide external clock fernando will look and see what is available production units will go to UMass in a month late oct, modules via umass should arrive

Mini-TOF Update

Randall

package of bent plates arrived, some may not work not stainless making light guides long versions made for first time pmt sleeves completed shield holders completed all light guides manufactured more material requested mark will order

paul and ian will meet on glueing fixture for 5 paddles at once box of plates delivered to old central receiving

Contract Status

Calibration and Alignment

A new version of the calibration document will be distributed shortly.

Technical Design Report Contribution