Difference between revisions of "GlueX TOF Meeting, August 18, 2011"

From GlueXWiki
Jump to: navigation, search
(present)
(Minutes)
Line 40: Line 40:
 
* '''JLab''': Eugene Chudakov, Chuck Hutton, Mark Ito (chair), Simon Taylor, Beni Zihlmann
 
* '''JLab''': Eugene Chudakov, Chuck Hutton, Mark Ito (chair), Simon Taylor, Beni Zihlmann
  
 +
==Statement of Work==
  
schedule
+
Mark circulated a draft of the statement of work recently. Eugene had some questions:
budget
+
resolution
+
  
send copy to sasha of sow
+
* Is the resolution stated consistent with the proposal?
 +
* Is the schedule realistic?
 +
 
 +
Mark received a copy of Elton's scintillator specification from CLAS. Eugene suggested getting a copy of the CLAS12 specification from Dan.
 +
 
 +
==PMT Purchase==
 +
 
 +
Mark is collecting documentation on the phototubes we are considering for purchase. Details of the procurement process are being discussed.
  
talk to dan about scintillator specification
 
  
 
50% 132 ps
 
50% 132 ps

Revision as of 12:26, 18 August 2011

Location, Time

Thursday, August 18, 2011
10:00 am EDT
JLab: CEBAF Center, Room F326

Agenda

  1. Announcements
  2. Minutes from the last meeting
  3. Prototype Status
  4. Contract Status


Communication

Videoconference

  1. ESNet: 8542553
  2. EVO: EVO site

Telephone

  1. dial:
  2. enter access code followed by the # sign: 3421244#

Slides

Talks can be deposited in the directory /group/halld/www/halldweb1/html/talks/2011-3Q on the JLab CUE. This directory is accessible from the web at https://halldweb1.jlab.org/talks/2011-3Q/ .

Minutes

Present:

  • FSU: Sasha Ostrovidov
  • JLab: Eugene Chudakov, Chuck Hutton, Mark Ito (chair), Simon Taylor, Beni Zihlmann

Statement of Work

Mark circulated a draft of the statement of work recently. Eugene had some questions:

  • Is the resolution stated consistent with the proposal?
  • Is the schedule realistic?

Mark received a copy of Elton's scintillator specification from CLAS. Eugene suggested getting a copy of the CLAS12 specification from Dan.

PMT Purchase

Mark is collecting documentation on the phototubes we are considering for purchase. Details of the procurement process are being discussed.


50% 132 ps 80% 126 ps 20% about same as 50 50

roatrate test had mechanical difficulties

drawings on tof page

last times minutes

sow purchase tube type