Difference between revisions of "December 19, 2017 DIRC"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
 
(4 intermediate revisions by the same user not shown)
Line 23: Line 23:
 
#** Monitoring System (John and Yunjie)
 
#** Monitoring System (John and Yunjie)
 
#** Gas system (John)
 
#** Gas system (John)
#** Temporary storage for bar boxes in the hall [[Media:IMG 2194.jpg]]
+
#** Temporary storage for bar boxes in the hall [https://halldweb.jlab.org/wiki/images/f/fa/BarRackIso.jpg Design (inverted)] [https://halldweb.jlab.org/wiki/images/3/3e/IMG_2194.jpg SLAC structure]
 
#** Dates to discuss with SLAC?
 
#** Dates to discuss with SLAC?
 
# Optical box
 
# Optical box
#* Design and PMT mounting update (Ernie and Jason)
+
#* Design drawings and PMT mounting update (Ernie and Jason)
#** Final drawings for review
+
#** Questions to drawing package: [https://www.dropbox.com/s/rvsubsp62145w6x/GLUEX%20FOB%20MK2%20BOX%20WELDMENT%20LH.STEP?dl=0 STEP file]
 +
#*** The 1/4 and 3/4 npt holes on the bottom and top plates are for the water system, correct?
 +
#*** The 1/2 npt is for some water level meter?
 +
#*** Since there are no features for water on the side plates, I assume the FOB will be completely full with water and will exit through the top fitting in the 3/4 npt hole?
 +
#*** If the box is completely full, no nitrogen purge is needed?
 +
#*** The weld callout for the 1/8 inch plate to the frame calls for a 25mm fillet (see attached). Is this true?
 +
#*** What is the fillet weld size on the inside of frame (opposite the seam weld)?
 +
#* Presentation on assembly sequence in January?
 
#* Simulation studies (Maria and Roman)
 
#* Simulation studies (Maria and Roman)
#** Several signal channels: [[https://gluexdirc.mit.edu/dirc-h2600]]
+
#** Several signal channels: [https://gluexdirc.mit.edu/dirc-h2600 h(2600)] [https://gluexdirc.mit.edu/dirc-etaprime2300-0 eta'(2300)] [https://gluexdirc.mit.edu/dirc-y2175 Y(2175)] [https://gluexdirc.mit.edu/dirc-phi1850 phi(1850)] [https://gluexdirc.mit.edu/dirc-xi1820 Xi(1820)]
 
# AOB
 
# AOB

Latest revision as of 13:52, 19 December 2017

Meeting Information

GlueX DIRC Meeting
Tuesday December 19, 2017
1:00 pm, EDT
JLab room A110

Connection Using Bluejeans

  1. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
  2. To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
  3. To join via phone, use one of the following numbers and the Conference ID: 846453895
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. More information on connecting to bluejeans is available.

Agenda

  1. Announcements
  2. Support structure update (John, Tim, Tom)
  3. Bar box transportation
    • Planning for final 3 bar boxes
      • Monitoring System (John and Yunjie)
      • Gas system (John)
      • Temporary storage for bar boxes in the hall Design (inverted) SLAC structure
      • Dates to discuss with SLAC?
  4. Optical box
    • Design drawings and PMT mounting update (Ernie and Jason)
      • Questions to drawing package: STEP file
        • The 1/4 and 3/4 npt holes on the bottom and top plates are for the water system, correct?
        • The 1/2 npt is for some water level meter?
        • Since there are no features for water on the side plates, I assume the FOB will be completely full with water and will exit through the top fitting in the 3/4 npt hole?
        • If the box is completely full, no nitrogen purge is needed?
        • The weld callout for the 1/8 inch plate to the frame calls for a 25mm fillet (see attached). Is this true?
        • What is the fillet weld size on the inside of frame (opposite the seam weld)?
    • Presentation on assembly sequence in January?
    • Simulation studies (Maria and Roman)
  5. AOB