December 19, 2017 DIRC

From GlueXWiki
Jump to: navigation, search

Meeting Information

GlueX DIRC Meeting
Tuesday December 19, 2017
1:00 pm, EDT
JLab room A110

Connection Using Bluejeans

  1. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
  2. To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
  3. To join via phone, use one of the following numbers and the Conference ID: 846453895
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. More information on connecting to bluejeans is available.

Agenda

  1. Announcements
  2. Support structure update (John, Tim, Tom)
  3. Bar box transportation
    • Planning for final 3 bar boxes
      • Monitoring System (John and Yunjie)
      • Gas system (John)
      • Temporary storage for bar boxes in the hall Design (inverted) SLAC structure
      • Dates to discuss with SLAC?
  4. Optical box
    • Design drawings and PMT mounting update (Ernie and Jason)
      • Questions to drawing package: STEP file
        • The 1/4 and 3/4 npt holes on the bottom and top plates are for the water system, correct?
        • The 1/2 npt is for some water level meter?
        • Since there are no features for water on the side plates, I assume the FOB will be completely full with water and will exit through the top fitting in the 3/4 npt hole?
        • If the box is completely full, no nitrogen purge is needed?
        • The weld callout for the 1/8 inch plate to the frame calls for a 25mm fillet (see attached). Is this true?
        • What is the fillet weld size on the inside of frame (opposite the seam weld)?
    • Presentation on assembly sequence in January?
    • Simulation studies (Maria and Roman)
  5. AOB