Difference between revisions of "DC and PID Review"
From GlueXWiki
Line 7: | Line 7: | ||
** [http://www.jlab.org/Hall-D/gluex_secure/schedule_final_eir-review.pdf P3e Schedule] (gluex) | ** [http://www.jlab.org/Hall-D/gluex_secure/schedule_final_eir-review.pdf P3e Schedule] (gluex) | ||
− | * | + | * <b>Pre-brief Material for the reviewers</b> |
− | + | ||
** GlueX-doc-999 [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=999 GlueX Physics and Detecor Performance Metrics] | ** GlueX-doc-999 [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=999 GlueX Physics and Detecor Performance Metrics] | ||
** GlueX-doc-990 [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=990 The GlueX Central Drift Chamber] | ** GlueX-doc-990 [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=990 The GlueX Central Drift Chamber] | ||
Line 19: | Line 18: | ||
** GlueX-doc-992 [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=992 Start Counter Update] | ** GlueX-doc-992 [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=992 Start Counter Update] | ||
− | * Relevant Wiki Pages | + | * <b>Relevant Wiki Pages</b> |
− | + | ||
** Description [[CDC]] | ** Description [[CDC]] | ||
** Description [[FDC]] | ** Description [[FDC]] |
Revision as of 11:39, 13 May 2008
Preparations for the Hall D DC and PID Final Design and Safety Review
Review: Mar 27 and 28
- Previous Reviews
- Mar 27-28 Review Documents (halld guest)
- Charge, Agenda, Reviewers
- P3e Schedule (gluex)
- Pre-brief Material for the reviewers
- GlueX-doc-999 GlueX Physics and Detecor Performance Metrics
- GlueX-doc-990 The GlueX Central Drift Chamber
- GlueX-doc-754 Forward Drift Chamber Technical Design Report
- GlueX-d0c-1004 Track Finding and Fitting in GlueX: Development Report IV
- GlueX-doc-855 Specification Document for FDC/CDC ADC (125 MSPS)
- GlueX-doc-995 Cable Characteristics for the Hall D FDC and CDC
- GlueX-doc-994 TOF detector description for CDR
- GlueX-doc-866 Design goals for the Hall D detector and subsystems
- GlueX-doc-992 Start Counter Update
- Relevant Wiki Pages
- Description CDC
- Description FDC
- Description Forward Time-of-Flight
- Description Start Counter (Werner)
- Description Electronics
- Safety/QA documentation ESH&Q ?
- Drawings (Tim)
Dry Run Schedule for the Review
- First round of dry runs (week of March 10)
- Monday L102/104 Mar 10
- Talk 15 2:30pm Fernando Tracking & PID Electronics
- Tuesday F326/327 Mar 11
- Talk 8 4:00 pm Tim DC mechanical design
- Wednesday Mar 12
- Talk 3 8:00 am Dan FDC Design F326/327
- Talk 4 4:00 pm David Simulation/Reconstruction L207
- Thursday F326/327 Mar 13
- Friday F326/327 Mar 14
- Talk 7 8:00 am Eugene
- Talk 1 10:00 am Curtis
- Monday L102/104 Mar 10
- Second round of dry runs (weeks of Mar 17 and 24)
- Monday F326/327 Mar 17
- Talk 15 1:00pm Eugene
- Talk 15 3:30pm Fernando Tracking & PID Electronics
- Tuesday F326/327 Mar 18
- Talk 8 4:00 pm Tim DC mechanical design
- Wednesday Mar 19
- Talk 3 9:00 am Dan FDC Design F326/327
- Talk 4 1:30 pm David Simulation/Reconstruction F326/327
- Thursday F326/327 Mar 20
- Friday F326/327 Mar 14
- Talk 7 8:00 am Eugene
- Monday F326/327 Mar 24
- Talk 1 9:00 am Curtis
- Talk 2 (is this link correct? Yes) 4:00 pm Yves
- Monday F326/327 Mar 17
- Final talks to Elke:Tue Mar 25
- Review: Mar 27 and 28
- issues that need special attention