Difference between revisions of "DC and PID Review"

From GlueXWiki
Jump to: navigation, search
(The Hall D DC and PID Final Design and Safety Review)
Line 1: Line 1:
 
== The Hall D DC and PID Final Design and Safety Review ==
 
== The Hall D DC and PID Final Design and Safety Review ==
Review: Mar 27 and 28 <br>
 
  
 +
* Charge, [http://www.jlab.org/Hall-D/guest_secure/Tracking_PID_REVIEW_Mar08/Agenda.doc Agenda], Reviewers
 +
* [http://www.jlab.org/Hall-D/guest_secure/Tracking_PID_REVIEW_Mar08/ Mar 27-28 Review Website] (halld guest)
 +
* [http://www.jlab.org/Hall-D/gluex_secure/schedule_final_eir-review.pdf P3e Schedule] (gluex)
 
* [http://www.jlab.org/Hall-D/reviews Previous Reviews]
 
* [http://www.jlab.org/Hall-D/reviews Previous Reviews]
* [http://www.jlab.org/Hall-D/guest_secure/Tracking_PID_REVIEW_Mar08/ Mar 27-28 Review Documents] (halld guest)
+
 
** Charge, [http://www.jlab.org/Hall-D/guest_secure/Tracking_PID_REVIEW_Mar08/Agenda.doc Agenda], Reviewers
+
** [http://www.jlab.org/Hall-D/gluex_secure/schedule_final_eir-review.pdf P3e Schedule] (gluex)
+
  
 
* <b>Pre-brief Material for the reviewers</b>
 
* <b>Pre-brief Material for the reviewers</b>

Revision as of 13:07, 13 May 2008

The Hall D DC and PID Final Design and Safety Review


Dry Run Schedule for the Review

  1. First round of dry runs (week of March 10)
    1. Monday L102/104 Mar 10
    2. Tuesday F326/327 Mar 11
    3. Wednesday Mar 12
    4. Thursday F326/327 Mar 13
    5. Friday F326/327 Mar 14
      • Talk 7 8:00 am Eugene
      • Talk 1 10:00 am Curtis
  2. Second round of dry runs (weeks of Mar 17 and 24)
    1. Monday F326/327 Mar 17
    2. Tuesday F326/327 Mar 18
    3. Wednesday Mar 19
    4. Thursday F326/327 Mar 20
    5. Friday F326/327 Mar 14
      • Talk 7 8:00 am Eugene
    6. Monday F326/327 Mar 24
  3. Final talks to Elke:Tue Mar 25
  4. Review: Mar 27 and 28
  5. issues that need special attention