Difference between revisions of "Controls Meeting 8-Sep-2011"

From GlueXWiki
Jump to: navigation, search
m
m
Line 46: Line 46:
  
 
==Next Meeting==
 
==Next Meeting==
 +
 +
Thurs 22-Sep 9:30am CC L207
  
  
  
 
=Minutes=
 
=Minutes=
 +
 +
Present:  Elliott W, Josh B, Hovanes E, David L, Scot S, Mark S.

Revision as of 16:45, 8 September 2011

Agenda

  • Announcements
    • Power engineer being hired
    • GlueX collaboration meeting 6-8 Oct
  • Minutes from previous meeting 11-Aug-2011
  • Equipment orders - Mark, Hovanes
    • test equipment
    • rack hardware, Ethernet power strips
  • Test Lab status
    • what has Sarin come up with concerning the Danfysik power supply?
    • what needs to be moved out and when?
  • Upgrade to solenoid control system - All
    • needed about one year from now
    • new hardware design based on experience in Test Lab
    • need to collect requirements for hardware and software
    • do we want to upgrade to Ethernet/IP control on Danfysik power supply (from RS232)?
    • need subgroup to work on this
  • A-B licenses and license server - Josh
    • add licenses from other groups? dedicated licenses? priorities?
  • Interim networking in the hall - Elliott
  • Big UPS ordered - Elliott
    • should we run circuits to the hall? If so, to what?
  • Solenoid controls racks in the hall - Elliott
  • ControlNet vs Ethernet/IP - Hovanes
  • Controls test stand, BOY, etc. - Hovanes
  • Nerses Gevorgyan coming - Hovanes
    • what should he work on? device drivers vs EPICS utilities vs Java stuff vs ...?
  • Target controls needed by next summer
  • IRMIS - Elliott
  • Mantis task tracker



Time/Location

9:30 AM Thurs 8-Sep-2011 CC L207


Announcements

Next Meeting

Thurs 22-Sep 9:30am CC L207


Minutes

Present: Elliott W, Josh B, Hovanes E, David L, Scot S, Mark S.