* Announcements
 
* Announcements
 
** Power engineer being hired
 
** Power engineer being hired
 +
** GlueX collaboration meeting 6-8 Oct
 
* Minutes from previous meeting [[Controls_Meeting_11-Aug-2011|11-Aug-2011]]
 
* Minutes from previous meeting [[Controls_Meeting_11-Aug-2011|11-Aug-2011]]
 
* Equipment orders - Mark, Hovanes
 
* Equipment orders - Mark, Hovanes
Line 26: Line 27:
 
* Nerses Gevorgyan coming - Hovanes
 
* Nerses Gevorgyan coming - Hovanes
 
** what should he work on? device drivers vs EPICS utilities vs Java stuff vs ...?
 
** what should he work on? device drivers vs EPICS utilities vs Java stuff vs ...?
 +
* Target controls needed by next summer
 
* [http://irmisvm.jlab.org:8080/IRMISComponents IRMIS] - Elliott
 
* [http://irmisvm.jlab.org:8080/IRMISComponents IRMIS] - Elliott
 
* [http://halldweb1.jlab.org/mantisbt Mantis task tracker]
 
* [http://halldweb1.jlab.org/mantisbt Mantis task tracker]

Revision as of 09:02, 8 September 2011

Agenda

  • Announcements
    • Power engineer being hired
    • GlueX collaboration meeting 6-8 Oct
  • Minutes from previous meeting 11-Aug-2011
  • Equipment orders - Mark, Hovanes
    • test equipment
    • rack hardware, Ethernet power strips
  • Test Lab status
    • what has Sarin come up with concerning the Danfysik power supply?
    • what needs to be moved out and when?
  • Upgrade to solenoid control system - All
    • needed about one year from now
    • new hardware design based on experience in Test Lab
    • need to collect requirements for hardware and software
    • do we want to upgrade to Ethernet/IP control on Danfysik power supply (from RS232)?
    • need subgroup to work on this
  • A-B licenses and license server - Josh
    • add licenses from other groups? dedicated licenses? priorities?
  • Interim networking in the hall - Elliott
  • Big UPS ordered - Elliott
    • should we run circuits to the hall? If so, to what?
  • Solenoid controls racks in the hall - Elliott
  • ControlNet vs Ethernet/IP - Hovanes
  • Controls test stand, BOY, etc. - Hovanes
  • Nerses Gevorgyan coming - Hovanes
    • what should he work on? device drivers vs EPICS utilities vs Java stuff vs ...?
  • Target controls needed by next summer
  • IRMIS - Elliott
  • Mantis task tracker



Time/Location

9:30 AM Thurs 8-Sep-2011 CC L207


Announcements

Next Meeting

Minutes