* Announcements | * Announcements | ||
** Power engineer being hired | ** Power engineer being hired | ||
+ | ** GlueX collaboration meeting 6-8 Oct | ||
* Minutes from previous meeting [[Controls_Meeting_11-Aug-2011|11-Aug-2011]] | * Minutes from previous meeting [[Controls_Meeting_11-Aug-2011|11-Aug-2011]] | ||
* Equipment orders - Mark, Hovanes | * Equipment orders - Mark, Hovanes | ||
Line 26: | Line 27: | ||
* Nerses Gevorgyan coming - Hovanes | * Nerses Gevorgyan coming - Hovanes | ||
** what should he work on? device drivers vs EPICS utilities vs Java stuff vs ...? | ** what should he work on? device drivers vs EPICS utilities vs Java stuff vs ...? | ||
+ | * Target controls needed by next summer | ||
* [http://irmisvm.jlab.org:8080/IRMISComponents IRMIS] - Elliott | * [http://irmisvm.jlab.org:8080/IRMISComponents IRMIS] - Elliott | ||
* [http://halldweb1.jlab.org/mantisbt Mantis task tracker] | * [http://halldweb1.jlab.org/mantisbt Mantis task tracker] |
Revision as of 09:02, 8 September 2011
Agenda
- Announcements
- Power engineer being hired
- GlueX collaboration meeting 6-8 Oct
- Minutes from previous meeting 11-Aug-2011
- Equipment orders - Mark, Hovanes
- test equipment
- rack hardware, Ethernet power strips
- Test Lab status
- what has Sarin come up with concerning the Danfysik power supply?
- what needs to be moved out and when?
- Upgrade to solenoid control system - All
- needed about one year from now
- new hardware design based on experience in Test Lab
- need to collect requirements for hardware and software
- do we want to upgrade to Ethernet/IP control on Danfysik power supply (from RS232)?
- need subgroup to work on this
- A-B licenses and license server - Josh
- add licenses from other groups? dedicated licenses? priorities?
- Interim networking in the hall - Elliott
- Big UPS ordered - Elliott
- should we run circuits to the hall? If so, to what?
- Solenoid controls racks in the hall - Elliott
- ControlNet vs Ethernet/IP - Hovanes
- Controls test stand, BOY, etc. - Hovanes
- Nerses Gevorgyan coming - Hovanes
- what should he work on? device drivers vs EPICS utilities vs Java stuff vs ...?
- Target controls needed by next summer
- IRMIS - Elliott
- Mantis task tracker
Time/Location
9:30 AM Thurs 8-Sep-2011 CC L207