Difference between revisions of "Controls Meeting 8-Sep-2011"

From GlueXWiki
Jump to: navigation, search
m
m
Line 7: Line 7:
 
** test equipment
 
** test equipment
 
** rack hardware
 
** rack hardware
* Danfysik status - Mark
+
* Test Lab status
** what has Sarin come up with?
+
** what has Sarin come up with concerning the Danfysik power supply?
 +
** what needs to be moved out and when?
 
* Upgrade to solenoid control system - All
 
* Upgrade to solenoid control system - All
 
** needed about one year from now
 
** needed about one year from now

Revision as of 15:21, 7 September 2011

Agenda

  • Announcements
    • Power engineer being hired
  • Minutes from previous meeting 11-Aug-2011
  • Equipment orders - Mark, Hovanes
    • test equipment
    • rack hardware
  • Test Lab status
    • what has Sarin come up with concerning the Danfysik power supply?
    • what needs to be moved out and when?
  • Upgrade to solenoid control system - All
    • needed about one year from now
    • new hardware design based on experience in Test Lab
    • need to collect requirements for hardware and software
  • A-B licenses and license server - Josh
  • Interim networking in the hall - Elliott
  • Big UPS ordered - Elliott
    • should we run circuits to the hall? If so, to what?
  • Controls racks in the hall - Elliott
  • ControlNet vs Ethernet/IP - Hovanes
  • Controls test stand, BOY, etc. - Hovanes
  • Nerses Gevorgyan coming - Hovanes
    • what should he work on? device drivers vs EPICS utilities vs Java stuff vs ...?
  • IRMIS - Elliott
  • Mantis task tracker