Difference between revisions of "Controls Meeting 6-Sep-2012"

From GlueXWiki
Jump to: navigation, search
(Created page with "=Agenda= * Announcements ** Daniel will talk about the FCAL base control system and firmware at the 20-Sep meeting * Minutes from previous meeting [[Controls_Meeting_23-Aug-2012...")
 
m
Line 3: Line 3:
 
* Announcements
 
* Announcements
 
** Daniel will talk about the FCAL base control system and firmware at the 20-Sep meeting
 
** Daniel will talk about the FCAL base control system and firmware at the 20-Sep meeting
 +
** Ed Jastrzembski will give a followup talk about FPGA programming in Oct
 
* Minutes from previous meeting [[Controls_Meeting_23-Aug-2012|23-Aug-2012]]
 
* Minutes from previous meeting [[Controls_Meeting_23-Aug-2012|23-Aug-2012]]
 
* Hardware purchase status - Josh, Hovanes
 
* Hardware purchase status - Josh, Hovanes
Line 11: Line 12:
 
* [http://halldweb1.jlab.org/JInventory JInventory improvements] - Elliott
 
* [http://halldweb1.jlab.org/JInventory JInventory improvements] - Elliott
 
* Solenoid test - Mark, Josh, Scot, Elliott
 
* Solenoid test - Mark, Josh, Scot, Elliott
 +
** '''Revised Cooldown Date'''
 
** Fasttrack schedule
 
** Fasttrack schedule
** Power supply maintenance OSP
+
** Power supply maintenance OSP, Cooldown OSP, Powered operations OSP, reviews
** Test plan, procedures, operations OSP, review
+
** Test plan, procedures, THA
 
** Vacuum, SOE, quench detector, etc.
 
** Vacuum, SOE, quench detector, etc.
 
* PLC programming and PXI system - Josh, Dave, Yi
 
* PLC programming and PXI system - Josh, Dave, Yi
* Danfysik tutorial part 3 - Sarin P.
 
 
* [http://halldweb1.jlab.org/mantisbt Mantis task tracker]
 
* [http://halldweb1.jlab.org/mantisbt Mantis task tracker]
 
* [https://halldweb1.jlab.org/elog-halld Midas elog]
 
* [https://halldweb1.jlab.org/elog-halld Midas elog]

Revision as of 09:35, 5 September 2012

Agenda

  • Announcements
    • Daniel will talk about the FCAL base control system and firmware at the 20-Sep meeting
    • Ed Jastrzembski will give a followup talk about FPGA programming in Oct
  • Minutes from previous meeting 23-Aug-2012
  • Hardware purchase status - Josh, Hovanes
  • Test Stand - Josh
    • SOE, Turbo pump
  • EPICS - Hovanes
  • Counting house installation - Hovanes
  • JInventory improvements - Elliott
  • Solenoid test - Mark, Josh, Scot, Elliott
    • Revised Cooldown Date
    • Fasttrack schedule
    • Power supply maintenance OSP, Cooldown OSP, Powered operations OSP, reviews
    • Test plan, procedures, THA
    • Vacuum, SOE, quench detector, etc.
  • PLC programming and PXI system - Josh, Dave, Yi
  • Mantis task tracker
  • Midas elog


  • Experiment Control Supervisor - Elliott
  • Accelerator Elog - Elliott


Time/Location

9:30AM Thurs 6-Sep-2012 CC L207


Announcements

Next Meeting

9:30am Thurs 20-Sep-2012 CC L207


Minutes