Difference between revisions of "Controls Meeting 6-Sep-2012"

From GlueXWiki
Jump to: navigation, search
m
m
Line 8: Line 8:
 
* Minutes from previous meeting [[Controls_Meeting_23-Aug-2012|23-Aug-2012]]
 
* Minutes from previous meeting [[Controls_Meeting_23-Aug-2012|23-Aug-2012]]
 
* Hardware purchase status - Josh, Hovanes
 
* Hardware purchase status - Josh, Hovanes
 +
* Danfysik board repair - Josh
 
* Test Stand - Josh
 
* Test Stand - Josh
 
** SOE, Turbo pump
 
** SOE, Turbo pump

Revision as of 16:37, 5 September 2012

Agenda

Note: we will move quickly through the status reports to give Beni plenty of time

  • Announcements
    • Daniel will talk about the FCAL base control system and firmware at the 20-Sep meeting
    • Ed Jastrzembski will give a followup talk about FPGA programming in Oct
  • Minutes from previous meeting 23-Aug-2012
  • Hardware purchase status - Josh, Hovanes
  • Danfysik board repair - Josh
  • Test Stand - Josh
    • SOE, Turbo pump
  • EPICS - Hovanes
  • Counting house installation - Hovanes
  • JInventory improvements - Elliott
    • purchase barcode labels now?
  • Solenoid test - Mark, Josh, Scot, Elliott
    • Revised Cooldown Date
    • Required documenation includes entries into JInventory database!
    • Fasttrack schedule
    • Power supply maintenance OSP, Cooldown OSP, Powered operations OSP, reviews
    • Test plan, procedures, THA
    • Vacuum, SOE, quench detector, etc.
  • PLC programming and PXI system - Josh, Dave, Yi
  • Gas System - Beni plot
  • Mantis task tracker
  • Midas elog


  • Experiment Control Supervisor - Elliott
  • Accelerator Elog - Elliott


Time/Location

9:30AM Thurs 6-Sep-2012 CC L207


Announcements

Next Meeting

9:30am Thurs 20-Sep-2012 CC L207

Minutes