Controls Meeting 23-Jan-2014

From GlueXWiki
Revision as of 10:26, 23 January 2014 by Hovanes (Talk | contribs) (Agenda)

Jump to: navigation, search

Agenda

  • Announcements
  • Minutes from previous meeting Controls Meeting 9-Jan-2014
  • UPS requirements for Hall D
    • Total maximum power consumed by PLC, location in the hall (Dave)
    • Total maximum power consumed by solenoid controls, location in the hall (Yi)
    • Total maximum power consumed by motor controls, location in the hall (Hovanes)
    • Total maximum power consumed by network switches, location in the hall (Hovanes)
    • Expected power usage and required time duration during power failure for PLC device (Dave)
    • Expected power usage and required time duration during power failure for solenoid controls (Yi)
    • Expected power usage and required time duration during power failure for motor controls (Hovanes)
    • Expected power usage and required time duration during power failure for network switches (Hovanes)

Time/Location

9:30AM Thurs 23-Jan-2014 CC A110