Difference between revisions of "Controls Meeting 23-Jan-2014"

From GlueXWiki
Jump to: navigation, search
(Agenda)
Line 4: Line 4:
 
* Minutes from previous meeting [[Controls Meeting 9-Jan-2014]]
 
* Minutes from previous meeting [[Controls Meeting 9-Jan-2014]]
 
* UPS requirements for Hall D
 
* UPS requirements for Hall D
*: [[media:PLClayoutInHallD.xlsx | Total maximum power consumed by PLC, location in the hall]] (Dave)
+
** [[media:PLClayoutInHallD.xlsx | Total maximum power consumed by PLC, location in the hall]] (Dave)
*: Total maximum power consumed by solenoid controls, location in the hall (Yi)
+
** Total maximum power consumed by solenoid controls, location in the hall (Yi)
*: Total maximum power consumed by motor controls, location in the hall (Hovanes)
+
** Total maximum power consumed by motor controls, location in the hall (Hovanes)
*: Expected power usage and required time duration during power failure for PLC device (Dave)
+
** Total maximum power consumed by network switches, location in the hall (Hovanes)
*: Expected power usage and required time duration during power failure for solenoid controls (Yi)
+
** Expected power usage and required time duration during power failure for PLC device (Dave)
*: Expected power usage and required time duration during power failure for motor controls (Hovanes)
+
** Expected power usage and required time duration during power failure for solenoid controls (Yi)
 +
** Expected power usage and required time duration during power failure for motor controls (Hovanes)
 +
** Expected power usage and required time duration during power failure for network switches (Hovanes)
  
 
==Time/Location==
 
==Time/Location==
 
  
 
9:30AM Thurs 23-Jan-2014 CC A110
 
9:30AM Thurs 23-Jan-2014 CC A110

Revision as of 10:26, 23 January 2014

Agenda

  • Announcements
  • Minutes from previous meeting Controls Meeting 9-Jan-2014
  • UPS requirements for Hall D
    • Total maximum power consumed by PLC, location in the hall (Dave)
    • Total maximum power consumed by solenoid controls, location in the hall (Yi)
    • Total maximum power consumed by motor controls, location in the hall (Hovanes)
    • Total maximum power consumed by network switches, location in the hall (Hovanes)
    • Expected power usage and required time duration during power failure for PLC device (Dave)
    • Expected power usage and required time duration during power failure for solenoid controls (Yi)
    • Expected power usage and required time duration during power failure for motor controls (Hovanes)
    • Expected power usage and required time duration during power failure for network switches (Hovanes)

Time/Location

9:30AM Thurs 23-Jan-2014 CC A110