Difference between revisions of "Controls Meeting 23-Jan-2014"

From GlueXWiki
Jump to: navigation, search
(Created page with "=Agenda= * Announcements * Minutes from previous meeting Controls Meeting 9-Jan-2014 * UPS requirements for Hall D *: Total maximum power consumed by PLC, location in the ha...")
 
Line 4: Line 4:
 
* Minutes from previous meeting [[Controls Meeting 9-Jan-2014]]
 
* Minutes from previous meeting [[Controls Meeting 9-Jan-2014]]
 
* UPS requirements for Hall D
 
* UPS requirements for Hall D
*: Total maximum power consumed by PLC, location in the hall (Dave)
+
*: [[media:PLClayoutInHallD.xlsx | Total maximum power consumed by PLC, location in the hall]] (Dave)
 
*: Total maximum power consumed by solenoid controls, location in the hall (Yi)
 
*: Total maximum power consumed by solenoid controls, location in the hall (Yi)
 
*: Total maximum power consumed by motor controls, location in the hall (Hovanes)
 
*: Total maximum power consumed by motor controls, location in the hall (Hovanes)

Revision as of 10:25, 23 January 2014

Agenda

  • Announcements
  • Minutes from previous meeting Controls Meeting 9-Jan-2014
  • UPS requirements for Hall D
    Total maximum power consumed by PLC, location in the hall (Dave)
    Total maximum power consumed by solenoid controls, location in the hall (Yi)
    Total maximum power consumed by motor controls, location in the hall (Hovanes)
    Expected power usage and required time duration during power failure for PLC device (Dave)
    Expected power usage and required time duration during power failure for solenoid controls (Yi)
    Expected power usage and required time duration during power failure for motor controls (Hovanes)

Time/Location

9:30AM Thurs 23-Jan-2014 CC A110