Difference between revisions of "Controls Meeting 20-Sep-2012"

From GlueXWiki
Jump to: navigation, search
m
m
Line 13: Line 13:
 
* Counting house installation - Hovanes
 
* Counting house installation - Hovanes
 
* [http://halldweb1.jlab.org/JInventory JInventory improvements] - Josh, Hovanes, Elliott
 
* [http://halldweb1.jlab.org/JInventory JInventory improvements] - Josh, Hovanes, Elliott
** Housing, power and control parent strategy
+
** Need document that specifies conventions
 +
*** Brand-Format-Model conventions, e.g. for buildings and rooms
 +
*** Housing, power and control hierarchy strategy
 +
*** Use of FormFactor, Function, Telecom, etc.
 +
*** IFP, IFR usage and naming schemes
 +
*** Naming schemes
 
** purchase barcode labels now?
 
** purchase barcode labels now?
 
* Solenoid test - Mark, Josh, Scot, Elliott
 
* Solenoid test - Mark, Josh, Scot, Elliott

Revision as of 15:12, 18 September 2012

Agenda

Note: we will move quickly through the status reports to give Daniel plenty of time

  • Announcements
    • Ed Jastrzembski will give a followup talk about FPGA programming in late Oct
  • Minutes from previous meeting 6-Sep-2012
  • Hardware purchase status - Josh, Hovanes
  • Danfysik board repair - Josh
  • Test Stand - Josh
  • EPICS - Hovanes
  • Counting house installation - Hovanes
  • JInventory improvements - Josh, Hovanes, Elliott
    • Need document that specifies conventions
      • Brand-Format-Model conventions, e.g. for buildings and rooms
      • Housing, power and control hierarchy strategy
      • Use of FormFactor, Function, Telecom, etc.
      • IFP, IFR usage and naming schemes
      • Naming schemes
    • purchase barcode labels now?
  • Solenoid test - Mark, Josh, Scot, Elliott
    • Revised Cooldown Date
    • Required documenation includes entries into JInventory database!
    • Fasttrack schedule
    • Power supply maintenance OSP, Cooldown OSP, Powered operations OSP, reviews
    • Test plan, procedures, THA, FMEA
    • Vacuum, SOE, quench detector, etc.
  • PLC programming and PXI system - Josh, Dave, Yi
  • FCAL Control System - Dan
  • Mantis task tracker
  • Midas elog


  • Experiment Control Supervisor - Elliott
  • Accelerator Elog - Elliott


Time/Location

9:30AM Thurs 20-Sep-2012 CC L207


Announcements

Next Meeting

Not sure due to vacation schedule


Minutes