Difference between revisions of "Controls Meeting 20-Sep-2012"

From GlueXWiki
Jump to: navigation, search
(Created page with "=Agenda= '''Note: we will move quickly through the status reports to give Dan plenty of time''' * Announcements ** Daniel will talk about the FCAL base control system and firm...")
 
m
Line 1: Line 1:
 
=Agenda=
 
=Agenda=
  
'''Note:  we will move quickly through the status reports to give Dan plenty of time'''
+
'''Note:  we will move quickly through the status reports to give Daniel plenty of time'''
  
 
* Announcements
 
* Announcements
** Daniel will talk about the FCAL base control system and firmware at the 20-Sep meeting
+
 
** Ed Jastrzembski will give a followup talk about FPGA programming in Oct
+
** Ed Jastrzembski will give a followup talk about FPGA programming in late Oct
 
* Minutes from previous meeting [[Controls_Meeting_6-Sep-2012|6-Sep-2012]]
 
* Minutes from previous meeting [[Controls_Meeting_6-Sep-2012|6-Sep-2012]]
 
* Hardware purchase status - Josh, Hovanes
 
* Hardware purchase status - Josh, Hovanes

Revision as of 12:29, 18 September 2012

Agenda

Note: we will move quickly through the status reports to give Daniel plenty of time

  • Announcements
    • Ed Jastrzembski will give a followup talk about FPGA programming in late Oct
  • Minutes from previous meeting 6-Sep-2012
  • Hardware purchase status - Josh, Hovanes
  • Danfysik board repair - Josh
  • Test Stand - Josh
  • EPICS - Hovanes
  • Counting house installation - Hovanes
  • JInventory improvements - Elliott
    • purchase barcode labels now?
  • Solenoid test - Mark, Josh, Scot, Elliott
    • Revised Cooldown Date
    • Required documenation includes entries into JInventory database!
    • Fasttrack schedule
    • Power supply maintenance OSP, Cooldown OSP, Powered operations OSP, reviews
    • Test plan, procedures, THA, FMEA
    • Vacuum, SOE, quench detector, etc.
  • PLC programming and PXI system - Josh, Dave, Yi
  • FCAL Control System - Dan
  • Mantis task tracker
  • Midas elog


  • Experiment Control Supervisor - Elliott
  • Accelerator Elog - Elliott


Time/Location

9:30AM Thurs 20-Sep-2012 CC L207


Announcements

Next Meeting

Not sure due to vacation schedule


Minutes