Difference between revisions of "Controls Meeting 16-Jun-2011"

From GlueXWiki
Jump to: navigation, search
m
m
Line 25: Line 25:
 
==Next Meeting==
 
==Next Meeting==
  
'''Not sure due to summer vacations'''
+
 
 +
Thurs 30-Jun-2011 CC F326
  
  
Line 31: Line 32:
 
=Minutes=
 
=Minutes=
  
Attendees:  Elliott W, Beni Z, David L, Hovanes E.
+
Attendees:  Elliott W, Beni Z, Tim W, Josh B, Eugene C.
 +
 
 +
 
 +
 
 +
'''FDC Gas System'''
 +
 
 +
Beni presented a preliminary P&I diagram for the FDC/CDC gas systems.  Much discussion ensued.
 +
 
 +
*

Revision as of 15:55, 29 June 2011

Agenda

  • Minutes from previous meeting 2-Jun-2011
  • Preliminary P&I diagram for FDC/CDC gas system Tracking Chamber Gas system - Beni
  • Strategy for use of PLC vs IOC vs mixed system - Elliott
    • what criteria push us one way or the other?
    • E.g: gas system, CAN system, FDC cooling, target, magnets, goniometer, HV/LV channels, crate control, etc.
  • Update on Brooks 0254 control IOC and CSS/BOY evaluation - Hovanes
  • Mantis task tracker - now being used for controls tasks
  • AOT


Time/Location

9:30 AM Thurs 16-Jun-2011 CC F326


Announcements

Next Meeting

Thurs 30-Jun-2011 CC F326


Minutes

Attendees: Elliott W, Beni Z, Tim W, Josh B, Eugene C.


FDC Gas System

Beni presented a preliminary P&I diagram for the FDC/CDC gas systems. Much discussion ensued.