Difference between revisions of "Controls Meeting 16-Jun-2011"

From GlueXWiki
Jump to: navigation, search
m
(Agenda)
Line 2: Line 2:
  
 
* Minutes from previous meeting [[Controls_Meeting_2-Jun-2011|2-Jun-2011]]
 
* Minutes from previous meeting [[Controls_Meeting_2-Jun-2011|2-Jun-2011]]
* Preliminary P&I diagram for FDC/CDC gas system - Beni
+
* Preliminary P&I diagram for FDC/CDC gas system [[Media:zihlmann_gassystem.pdf| Tracking Chamber Gas system]] - Beni
 
* Strategy for use of PLC vs IOC vs mixed system - Elliott
 
* Strategy for use of PLC vs IOC vs mixed system - Elliott
 
** what criteria push us one way or the other?
 
** what criteria push us one way or the other?
Line 26: Line 26:
  
 
'''Not sure due to summer vacations'''
 
'''Not sure due to summer vacations'''
 
 
  
 
=Minutes=
 
=Minutes=
  
 
Attendees:  Elliott W, Beni Z, David L, Hovanes E.
 
Attendees:  Elliott W, Beni Z, David L, Hovanes E.

Revision as of 07:27, 14 June 2011

Agenda

  • Minutes from previous meeting 2-Jun-2011
  • Preliminary P&I diagram for FDC/CDC gas system Tracking Chamber Gas system - Beni
  • Strategy for use of PLC vs IOC vs mixed system - Elliott
    • what criteria push us one way or the other?
    • E.g: gas system, CAN system, FDC cooling, target, magnets, goniometer, HV/LV channels, crate control, etc.
  • Update on Brooks 0254 control IOC and CSS/BOY evaluation - Hovanes
  • Mantis task tracker - now being used for controls tasks
  • AOT


Time/Location

9:30 AM Thurs 16-Jun-2011 CC F326


Announcements

Next Meeting

Not sure due to summer vacations

Minutes

Attendees: Elliott W, Beni Z, David L, Hovanes E.