Difference between revisions of "BLTWG Meeting 5/29/2008"

From GlueXWiki
Jump to: navigation, search
(Notes)
(Notes)
Line 12: Line 12:
 
Here are a couple of pictures of the simulated photon beam transverse profile downstream of the secondary collimator.
 
Here are a couple of pictures of the simulated photon beam transverse profile downstream of the secondary collimator.
  
[[Image:Prof2.gif|2cm]]
+
[[Image:Prof2.gif|200px]]
[[Image:Slice1.gif|2cm]]
+
[[Image:Slice1.gif|200px]]
[[Image:Slice1log.gif|2cm]]
+
[[Image:Slice1log.gif|200px]]

Revision as of 10:29, 29 May 2008

  • Time: 10:00 EST
  • Place: EVO and ESNET
  • Present:

Agenda

  1. Items from last week
  2. Discussion of the accelerator interface document
  3. Discussion of the updated pair spectrometer proposal
  4. Ken Livingston's proposed agreement for working with diamonds

Notes

Here are a couple of pictures of the simulated photon beam transverse profile downstream of the secondary collimator.

Prof2.gif Slice1.gif Slice1log.gif