Difference between revisions of "BLTWG Meeting 03/07/2011"

From GlueXWiki
Jump to: navigation, search
(Agenda)
Line 6: Line 6:
 
===Agenda===
 
===Agenda===
  
 +
# New geometry for beamline in Geant simulation -- ''Richard''
 
# [http://zeus.phys.uconn.edu/halld/glueXmeetings/mtg-2-2011/Beamtest-2-2011.pptx Parasitic beam time request goals] -- ''Richard''
 
# [http://zeus.phys.uconn.edu/halld/glueXmeetings/mtg-2-2011/Beamtest-2-2011.pptx Parasitic beam time request goals] -- ''Richard''
 
# Preparations for beam tests -- ''discussion''
 
# Preparations for beam tests -- ''discussion''
 
# [[Pair Spectrometer Magnet Simulation]] Sascha Glamazdin/ Sascha Somov
 
# [[Pair Spectrometer Magnet Simulation]] Sascha Glamazdin/ Sascha Somov
 
# [[Finalizing design of the vacuum chamber]] Sascha
 
# [[Finalizing design of the vacuum chamber]] Sascha

Revision as of 12:00, 7 March 2011

Time: 11:00 EST
  • Place: ESNET and EVO (with telephone bridge id 296 3277)
  • Connecting: instructions are here
  • Present:

Agenda

  1. New geometry for beamline in Geant simulation -- Richard
  2. Parasitic beam time request goals -- Richard
  3. Preparations for beam tests -- discussion
  4. Pair Spectrometer Magnet Simulation Sascha Glamazdin/ Sascha Somov
  5. Finalizing design of the vacuum chamber Sascha