=Minutes= | =Minutes= | ||
− | Online: Elton, Beni, Tim, Richard, Curtis, Zisis, Andrei, George, Christina | + | Online: Elton, Beni, Tim, Richard, Curtis, Zisis, Andrei, George, Christina, George V., Pavlos |
# FCAL - no report | # FCAL - no report | ||
Line 38: | Line 38: | ||
#* Richard's report. It was agreed that Andrei, Beni and Richard (and anybody else interested) would connect through video conference to discuss this work. Zisis will post the time and date to halld-cal. | #* Richard's report. It was agreed that Andrei, Beni and Richard (and anybody else interested) would connect through video conference to discuss this work. Zisis will post the time and date to halld-cal. | ||
#* Zisis gave a report on MC activities in Regina. A talk will be given at the collaboration meeting. | #* Zisis gave a report on MC activities in Regina. A talk will be given at the collaboration meeting. | ||
− | # Fiber specs: | + | # Fiber specs: |
+ | #* We need to order more fibers, and now 4-m length ones for more reliable extraction of attenuation length. | ||
+ | #* George and Elton will work together on the fiber specs to include the testing protocol. | ||
+ | # Costbook: nothing specific, but there are concerns on currency fluctuation and prices of European and Japanese items. The project has contigency for these things. | ||
+ | # Calibration: George V. gave a report. Most parts are in and tests should start soon. George V. ran through the plans and hopes to have results in a few weeks. |
Revision as of 11:11, 21 April 2008
Connection
- The meeting will be held at 10:30 am ET
- Phone:
- +1-800-377-8846 : US
- +1-888-276-7715 : Canada
- +1-302-709-8424 : International
- then enter participant code: 39527048# (remember the "#")
Reference Documents
- Previous minutes: April 15, 2008 Calorimetry
- Schedule, Tracker and Drawings (gluex pass)
- Schedule
Tentative Agenda
- FCAL Update
- BCAL Update plus continue discussion on topics below
- Reanalysis of timing resolution from cosmics (Media:talk080415.pdf) - Andrei/Irina
- SiPM gain non-uniformities and energy resolution [1] (Richard)
- Monte Carlo progress
- Fiber Specifications
- Do we need more samples?
- How to specify a) Fiber color/spectrum and b) light output
- Review of Action Item Tracker
- Fabrication plan and QA /visit to Alberta?
- Costbook changes for currency and commodities price variations?
- Calibration system update
- Any other business
Minutes
Online: Elton, Beni, Tim, Richard, Curtis, Zisis, Andrei, George, Christina, George V., Pavlos
- FCAL - no report
- BCAL
- Timing resolution; no questions
- Richard's report. It was agreed that Andrei, Beni and Richard (and anybody else interested) would connect through video conference to discuss this work. Zisis will post the time and date to halld-cal.
- Zisis gave a report on MC activities in Regina. A talk will be given at the collaboration meeting.
- Fiber specs:
- We need to order more fibers, and now 4-m length ones for more reliable extraction of attenuation length.
- George and Elton will work together on the fiber specs to include the testing protocol.
- Costbook: nothing specific, but there are concerns on currency fluctuation and prices of European and Japanese items. The project has contigency for these things.
- Calibration: George V. gave a report. Most parts are in and tests should start soon. George V. ran through the plans and hopes to have results in a few weeks.