(Created page with "== Meeting Time and Place == Tuesday, April 09, 2024, 1pm Hall D Counting House * Invited - Hovanes Egiyan, Stephanie Worthington, Keith Harding, Pavel Degtiarenko, Tim Whi...")
 
(Agenda)
Line 10: Line 10:
 
** Copper Absorber translatable model to Fluka?
 
** Copper Absorber translatable model to Fluka?
 
** Layout of magnet and components (Stephanie/Keith)
 
** Layout of magnet and components (Stephanie/Keith)
* Power supply status
+
* Power supply status - On order, due March 2025
 
* Magnet update (Josh/Stephanie) [[media:CPS Magnet Design_v2.pdf]]
 
* Magnet update (Josh/Stephanie) [[media:CPS Magnet Design_v2.pdf]]
  

Revision as of 08:42, 9 April 2024

Meeting Time and Place

Tuesday, April 09, 2024, 1pm Hall D Counting House

  • Invited - Hovanes Egiyan, Stephanie Worthington, Keith Harding, Pavel Degtiarenko, Tim Whitlatch, Eugene Chudakov, Josh Ballard

Agenda

Minutes

  • Reviewed minutes from last meeting
  • Discussed progress on 3D model
    • Discussed possibility of removing borated poly layer from the back side when moving CPS out of beamline
      • Pavel will check radiation levels
      • It will make more clearance for GlueX reinstall
      • Poly can be attached outside of support frame
    • current model shows using cartridges from the FCAL for support and alignment set at 33% in Z. Need to move them out slightly
    • Ok to have a gap upstream of copper absorber for water lines - total shielding thickness still needed
    • On downstream end, keep center Cu/W inner block up against the absorber (inside of the water lines) OK for gap outside this
    • Currently the copper absorber model is 1.67 cm below beam center, we will move to 2 cm below
    • Cu absorber water channels modified to .5 in holes x8. Keith/Josh will get Pavel a usable 3D model of the modified absorber to import into Fluka
  • Need to set the center of the magnet poles 2cm below beamline
  • Magnet pole gap is clear of all materials, Cu/W can fill in coil regions
  • Get Z dimensions for all components

Action Items

  • Pavel to check radiation levels to see if poly can be removed after experiment
  • Tim to supply Z locations for adjustment cartridges
  • Keith to update 3D model with changes discussed including move magnet down 2cm and absorber to 2cm below beamline
  • Get absorber 3D model to Pavel - Keith/Josh