Difference between revisions of "2020-09-24"

From GlueXWiki
Jump to: navigation, search
(Additional brief reports from working groups as needed: add Mark's notes)
 
Line 44: Line 44:
 
*** status of analysis launches
 
*** status of analysis launches
 
** Offline Meeting:  [[GlueX_Software_Meeting,_September_15,_2020| September 15, 2020]] (Mark)
 
** Offline Meeting:  [[GlueX_Software_Meeting,_September_15,_2020| September 15, 2020]] (Mark)
 +
*** [https://markito3.wordpress.com/2020/09/24/gluex-meeting-report-september-24-2020/ Mark's Notes]
 
** Particle ID Working Group: [[GlueX_PID_Meeting,_August_25,_2020 | August 25, 2020]] (Simon)
 
** Particle ID Working Group: [[GlueX_PID_Meeting,_August_25,_2020 | August 25, 2020]] (Simon)
  

Latest revision as of 10:39, 24 September 2020

Meeting Coordinates

The meeting will be on Thursday September 24, 2020 at 11:00 AM EDT.

Connecting

  1. To join via a Web Browser, go to the page [1] https://bluejeans.com/660743227.
  2. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 660743227.
  3. To join via phone, use one of the following numbers and the Conference ID: 660743227.
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. Upon connection all microphones are automatically muted. To unmute your mike on a Polycom or equivalent unit, enter *4. Unmuting on a computer is trivial as there is a microphone button than can be clicked.
  5. More information on connecting to bluejeans is available.

Agenda

  1. Announcements
    • Spring run is complete -- special thanks to local GlueX team!
      • Data size for 2020: about 115% of all GlueX phase 1
    • Virtual October Collaboration Meeting: Thursday 10/22 to Saturday 10/24
      • register here
      • emphasis on analysis and task-force reports: anticipate draft agenda soon
  2. Status of GlueX-II data production at NERSC and PSC (Dave)
    • near term plan: shift some processing back to JLab farm; investigate processing at IU; hope to complete spring data by the end of the year
  3. PrimEx calibration status (Sasha)
    • reproduce PS skims and make first REST version
  4. SRC proposal
    • anticipate response from Curtis and George soon
  5. Enhancing collaboration
    • GlueX photobook, login to portal and click "people" -- please add photos! Over two-thirds of the collaboration is still missing.
  6. PAC: jeopardy session is tomorrow
  7. Specific areas where specialized help is needed -- contact Matt if you are interested in contributing to these
    • TAGH calibration, hardware maintenance, etc.
    • Systematic studies of kinematic fitting, efficiency of chi^2 cuts, etc., in data and MC
    • Simulation needs: care and maintenance of OSG interface, updating smearing
    • Development of offsite data processing systems
    • Maintenance of online monitoring tools (rootspy or full transition to hydra)

Additional brief reports from working groups as needed