Difference between revisions of "2020-09-24"
From GlueXWiki
(Created page with "== Meeting Coordinates == The meeting will be on Thursday September 24, 2020 at 11:00 AM EDT. ==== Connecting ==== # To join via a Web Browser, go to the page [https://bluej...") |
(→Agenda) |
||
Line 21: | Line 21: | ||
#** emphasis on analysis and task-force reports: anticipate draft agenda soon | #** emphasis on analysis and task-force reports: anticipate draft agenda soon | ||
# Status of GlueX-II data production at NERSC and PSC (Dave) | # Status of GlueX-II data production at NERSC and PSC (Dave) | ||
− | #* near term plan: shift some processing back to JLab farm; hope to complete spring data by the end of the year | + | #* near term plan: shift some processing back to JLab farm; investigate processing at IU; hope to complete spring data by the end of the year |
# PrimEx calibration status and next monitoring launch (Sasha) | # PrimEx calibration status and next monitoring launch (Sasha) | ||
# SRC proposal | # SRC proposal | ||
Line 28: | Line 28: | ||
#* [https://gluexweb.jlab.org GlueX photobook], login to portal and click "people" -- please add photos! (Naomi) | #* [https://gluexweb.jlab.org GlueX photobook], login to portal and click "people" -- please add photos! (Naomi) | ||
# PAC: jeopardy session is tomorrow | # PAC: jeopardy session is tomorrow | ||
+ | #* [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=4667 GlueX/JEF] | ||
+ | #* CPP | ||
# Specific areas where specialized help is needed -- contact Matt if you are interested in contributing to these | # Specific areas where specialized help is needed -- contact Matt if you are interested in contributing to these | ||
#* TAGH calibration, hardware maintenance, etc. | #* TAGH calibration, hardware maintenance, etc. |
Revision as of 16:08, 23 September 2020
Contents
Meeting Coordinates
The meeting will be on Thursday September 24, 2020 at 11:00 AM EDT.
Connecting
- To join via a Web Browser, go to the page [1] https://bluejeans.com/660743227.
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 660743227.
- To join via phone, use one of the following numbers and the Conference ID: 660743227.
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- Upon connection all microphones are automatically muted. To unmute your mike on a Polycom or equivalent unit, enter *4. Unmuting on a computer is trivial as there is a microphone button than can be clicked.
- More information on connecting to bluejeans is available.
Agenda
- Announcements
- Spring run is complete -- special thanks to local GlueX team!
- Data size for 2020: about 115% of all GlueX phase 1
- Virtual October Collaboration Meeting: Thursday 10/22 to Saturday 10/24
- register here
- emphasis on analysis and task-force reports: anticipate draft agenda soon
- Spring run is complete -- special thanks to local GlueX team!
- Status of GlueX-II data production at NERSC and PSC (Dave)
- near term plan: shift some processing back to JLab farm; investigate processing at IU; hope to complete spring data by the end of the year
- PrimEx calibration status and next monitoring launch (Sasha)
- SRC proposal
- anticipate response from Curtis and George soon
- Enhancing collaboration
- GlueX photobook, login to portal and click "people" -- please add photos! (Naomi)
- PAC: jeopardy session is tomorrow
- GlueX/JEF
- CPP
- Specific areas where specialized help is needed -- contact Matt if you are interested in contributing to these
- TAGH calibration, hardware maintenance, etc.
- Systematic studies of kinematic fitting, efficiency of chi^2 cuts, etc., in data and MC
- Simulation needs: care and maintenance of OSG interface, updating smearing
- Development of offsite data processing systems
- Maintenance of online monitoring tools (rootspy or full transition to hydra)
Additional brief reports from working groups as needed
- Software and Analysis
- Production and Analysis Working Group: September 23, 2020 (Alex)
- Offline Meeting: September 15, 2020 (Mark)
- Particle ID Working Group: August 25, 2020 (Simon)
- Topical meetings
- Physics Working Group August 18, 2020 (Sean)
- DNP abstracts
- If you have submitted a DNP abstract, and are not regularly presenting at a topic WG meeting, it would be helpful to have a short (~5 min) status report within the next month at the appropriate meeting
- Reminder that all results shown in public should be presented to the Collaboration and approved prior to your practice talk
- Status of papers under review
- DNP abstracts
- Amplitude Analysis Working Group: August 24, 2020 (Alex A.)
- Cross-section Working Group: August 24, 2020 (Justin)
- Beam Asymmetry Working Group: August 31, 2020 (Zisis/Simon)
- PrimEx Working Group: September 4, 2020 (Sasha)
- Di-lepton Working Group: August 27, 2020 (Sean)
- JEF: September 4, 2020 (Simon/Liping/Sasha)
- Physics Working Group August 18, 2020 (Sean)
- Hardware Working Groups:
- Engineering Activities: FCAL-II, CPP, other (Tim)
- last meeting: CPP August 4, 2020
- Electronics and Firmware (Fernando)
- Beamline Status: September 1, 2020 (Richard)
- Tracking: September 3, 2020 (Naomi/Lubomir)
- DIRC: August 31, 2020 (Justin)
- Online Systems: DAQ, Controls, Monitoring (Sergey/Hovanes)
- Trigger (Sasha)
- Calorimetry September 3, 2020 (Zisis/Mark)
- Start Counter: August 20, 2020 (Mark I.)
- TOF: September 9, 2020 (Mark I.)
- Engineering Activities: FCAL-II, CPP, other (Tim)