Difference between revisions of "2020-08-13"

From GlueXWiki
Jump to: navigation, search
Line 42: Line 42:
 
#* [https://halldweb.jlab.org/wiki/index.php/Getting_Started_At_GlueX guidance for new collaborators and beginning students] (Sean/Justin)
 
#* [https://halldweb.jlab.org/wiki/index.php/Getting_Started_At_GlueX guidance for new collaborators and beginning students] (Sean/Justin)
 
#* [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=4619 Report and recommendations concerning diversity and inclusion] communicated to the CB
 
#* [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=4619 Report and recommendations concerning diversity and inclusion] communicated to the CB
 +
#** Thank you to Naomi, Olga, Tolga, Igal, and Mike M.
 
# Specific areas where specialized help is needed
 
# Specific areas where specialized help is needed
 
#* TAGH calibration, hardware maintenance, etc.  
 
#* TAGH calibration, hardware maintenance, etc.  

Revision as of 21:43, 12 August 2020

Meeting Coordinates

The meeting will be on Thursday August 13, 2020 at 11:00 AM EDT.

Connecting

  1. To join via a Web Browser, go to the page [1] https://bluejeans.com/660743227.
  2. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 660743227.
  3. To join via phone, use one of the following numbers and the Conference ID: 660743227.
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. Upon connection all microphones are automatically muted. To unmute your mike on a Polycom or equivalent unit, enter *4. Unmuting on a computer is trivial as there is a microphone button than can be clicked.
  5. More information on connecting to bluejeans is available.

Agenda

  1. Announcements
  2. Summer running
    • brief report from the RC (Alex A.)
    • CPP test plans (Tim/Elton)
    • signup for shifts and data quality monitoring Shift Schedule(Beni)
      • RC needed for September 8-14
      • offsite data quality monitor needed
  3. Status of GlueX-II data production (Igal/Dave)
    • critical path for producing future batches on PSC (Sean)
  4. PrimEx calibration/reconstruction status
    • next monitoring launch planned for this week (Sasha)
  5. Proposals to PAC
    • Neutral Pion Polarizability proposal has been endorsed
    • GDH Sum Rule proposal presented on Tuesday
    • Jeopardy presentations on September 25
      • charged pion polarizability (Rory)
      • JEF/GlueX update (Matt)
  6. SRC proposal: results of signal simulation exercise returned to committee (George and Curtis); awaiting review and response
  7. Upcoming external activities
  8. Healthy, happy collaboration
  9. Specific areas where specialized help is needed
    • TAGH calibration, hardware maintenance, etc.
    • Simulation needs: generating samples, OSG issues, updating smearing, ...

Additional brief reports from working groups as needed