Difference between revisions of "2018-10-09"
From GlueXWiki
(→Analysis Activities: update link ot Mark's notes) |
(→The Fall 2018 Runs) |
||
Line 20: | Line 20: | ||
* Official Run Schedule [https://www.jlab.org/div_dept/physics_division/experiments/schedule.html 2017/2018] | * Official Run Schedule [https://www.jlab.org/div_dept/physics_division/experiments/schedule.html 2017/2018] | ||
* [https://www.jlab.org/Hall-D/shifts/ Shift Schedule] | * [https://www.jlab.org/Hall-D/shifts/ Shift Schedule] | ||
+ | * [[Fall-2018-Running|Fall 2018 Running and Commissioning Plan]] | ||
=== Analysis Activities === | === Analysis Activities === |
Latest revision as of 09:13, 9 October 2018
Contents
Meeting Time and Place
The meeting will be on Tuesday October 9, 2018 at 11:15am EDT. For those people at Jefferson Lab, the meeting will be in room F326.
Meeting Connections
- To join via a Web Browser, go to the page [1] https://bluejeans.com/660743227.
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 660743227.
- To join via phone, use one of the following numbers and the Conference ID: 660743227.
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- Upon connection all microphones are automatically muted. To unmute your mike on a Polycom or equivalent unit, enter *4. Unmuting on a computer is trivial as there is a microphone button than can be clicked.
- More information on connecting to bluejeans is available.
Agenda
Announcements
The Fall 2018 Runs
- Run Meetings'
- Official Run Schedule 2017/2018
- Shift Schedule
- Fall 2018 Running and Commissioning Plan
Analysis Activities
- Offline Software October 2, 2018 Meeting and Mark's Notes
- Production and Analysis Working Group October 3, 2018
- Analysis Launch Submit Form
- Update on OSG and NERSC Activities
- Physics Working Group September 4, 2018
- Amplitude Analysis Working Group October 8, 2018
- Di-lepton Working Group August 16, 2018
- η/η' Working Group October 8, 2018
Data Acquisition and Electronics Systems
- Online Systems 2-Oct-2017
- Online Systems
- DAQ
- Controls Status
- Monitoring
- High-intensity Running
- Electronics and Trigger
- Electronics Update
- Level-1 Trigger
- Firmware Updates
Detector Updates
- Engineering Activities
- Magnets
- Target
- DIRC
- Other Activities
- Beamline Status September 17, 2018
- Diamonds
- Active Collimator
- Pair Spectrometer
- Hodoscope
- Microscope
- Polarimeter
- Start Counter August 9, 2018
- Tracking September 20, 2018
- CDC
- FDC
- Calorimeters: October 4, 2018 Calorimeter
- BCAL
- FCAL
- COMPCAL
- TOF August 15, 2018
- DIRC System October 8, 2018 DIRC
Other Activities
- AOT