Difference between revisions of "2018-08-28"

From GlueXWiki
Jump to: navigation, search
(Analysis Activities)
(Detector Updates)
 
(5 intermediate revisions by 3 users not shown)
Line 24: Line 24:
  
 
=== Analysis Activities ===
 
=== Analysis Activities ===
* Offline Software [[GlueX Offline Meeting, August 21, 2018| August 21, 2018 Meeting]] and [https://markito3.wordpress.com/2018/08/13/gluex-meeting-report-august-14-2018/ Mark's Notes]
+
* Offline Software [[GlueX Offline Meeting, August 21, 2018| August 21, 2018 Meeting]] and [https://markito3.wordpress.com/2018/08/27/gluex-meeting-report-august-28-2018/ Mark's Notes]
 
* Production and Analysis Working Group [https://halldweb.jlab.org/wiki-private/index.php/August_22,_2018,_Analysis_Working_Group August 22, 2018]
 
* Production and Analysis Working Group [https://halldweb.jlab.org/wiki-private/index.php/August_22,_2018,_Analysis_Working_Group August 22, 2018]
 
** Update on OSG and NERSC Activities
 
** Update on OSG and NERSC Activities
 
* Physics Working Group [https://halldweb.jlab.org/wiki-private/index.php/Aug_21,_2018,_Physics_Working_Group  August 21, 2018]
 
* Physics Working Group [https://halldweb.jlab.org/wiki-private/index.php/Aug_21,_2018,_Physics_Working_Group  August 21, 2018]
 
** Amplitude Analysis Working Group [https://halldweb.jlab.org/wiki-private/index.php/Amplitude_Analysis_Meeting,_August_27,_2018 August 27, 2018]
 
** Amplitude Analysis Working Group [https://halldweb.jlab.org/wiki-private/index.php/Amplitude_Analysis_Meeting,_August_27,_2018 August 27, 2018]
** Di-lepton Working Group [https://halldweb.jlab.org/wiki-private/index.php/Dilepton_Meeting,_July_19,_2018 July 19, 2018],[http://www.jlab.org/Hall-D/detector/fdc/jp/July2018_jpsi_xsec_gluex_comp.pdf]
+
** Di-lepton Working Group [https://halldweb.jlab.org/wiki-private/index.php/Dilepton_Meeting,_August_16_2018 August 16, 2018]
 
** η/η' Working Group [https://halldweb.jlab.org/wiki-private/index.php/Eta/Eta-Prime_Meeting_2018-08-27 August 27, 2018]
 
** η/η' Working Group [https://halldweb.jlab.org/wiki-private/index.php/Eta/Eta-Prime_Meeting_2018-08-27 August 27, 2018]
  
Line 50: Line 50:
 
** DIRC
 
** DIRC
 
** Other Activities
 
** Other Activities
* Beamline Status [[BLTWG Meeting 08/06/2018| August 6, 2018]]
+
* Beamline Status [[BLTWG Meeting 08/20/2018| August 20, 2018]]
 
** Diamonds
 
** Diamonds
 
** Active Collimator
 
** Active Collimator
Line 58: Line 58:
 
** Polarimeter
 
** Polarimeter
 
* Start Counter [[GlueX Start Counter Meeting, August 9, 2018|August 9, 2018]]
 
* Start Counter [[GlueX Start Counter Meeting, August 9, 2018|August 9, 2018]]
* Tracking [[meeting-8-9-2018|August 9, 2018]]
+
* Tracking [[meeting-7-26-2018|July 26, 2018]]
 
** CDC  
 
** CDC  
 
** FDC  
 
** FDC  
* Calorimeters: [[July 26, 2018 Calorimeter | July 27, 2018 Calorimeter]]  
+
* Calorimeters: [[Aug 23, 2018 Calorimeter| August 23, 2018 Calorimeter]]  
 
** BCAL  
 
** BCAL  
 
** FCAL  
 
** FCAL  
* TOF [[GlueX TOF Meeting, August 1, 2018|August 1, 2018]]
+
** COMPCAL
* DIRC System [[August 9, 2018 DIRC|August 9, 2018 DIRC]]
+
* TOF [[GlueX TOF Meeting, August 15, 2018|August 15, 2018]]
 +
* DIRC System [[August 20, 2018 DIRC|August 20, 2018 DIRC]]
  
 
=== Other Activities ===
 
=== Other Activities ===
 
* AOT
 
* AOT

Latest revision as of 13:57, 29 August 2018

Meeting Time and Place

The meeting will be on Tuesday August 28, 2018 at 11:15am EDT. For those people at Jefferson Lab, the meeting will be in room F326.

Meeting Connections

  1. To join via a Web Browser, go to the page [1] https://bluejeans.com/660743227.
  2. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 660743227.
  3. To join via phone, use one of the following numbers and the Conference ID: 660743227.
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. Upon connection all microphones are automatically muted. To unmute your mike on a Polycom or equivalent unit, enter *4. Unmuting on a computer is trivial as there is a microphone button than can be clicked.
  5. More information on connecting to bluejeans is available.

Agenda

Announcements

The Fall 2018 Runs

Analysis Activities

Data Acquisition and Electronics Systems

  • Online Systems 2-Oct-2017
    • Online Systems
    • DAQ
    • Controls Status
    • Monitoring
    • High-intensity Running
  • Electronics and Trigger
    • Electronics Update
    • Level-1 Trigger
    • Firmware Updates

Detector Updates

Other Activities

  • AOT