Difference between revisions of "2015-01-21"
From GlueXWiki
(→Announcements) |
(→Detector Updates) |
||
Line 41: | Line 41: | ||
** Polarimeter | ** Polarimeter | ||
* Start Counter [[GlueX Start Counter Meeting, December 12, 2014#Minutes|December 12, 2014]] | * Start Counter [[GlueX Start Counter Meeting, December 12, 2014#Minutes|December 12, 2014]] | ||
− | * Tracking [[Minutes- | + | * Tracking [[Minutes-1-15-2015|Joint FDC/CDC Meeting January 15, 2015]] |
** CDC | ** CDC | ||
** FDC | ** FDC | ||
Line 49: | Line 49: | ||
** BCAL | ** BCAL | ||
** BCAL Reconstruction [[BCAL Reconstruction Meeting 2014-12-12 | December 12, 2014]] | ** BCAL Reconstruction [[BCAL Reconstruction Meeting 2014-12-12 | December 12, 2014]] | ||
− | * TOF [[GlueX TOF Meeting, | + | * TOF [[GlueX TOF Meeting, January 13, 2015|January 13, 2015]] |
* Online Systems | * Online Systems | ||
** Level-1 Trigger Status | ** Level-1 Trigger Status | ||
Line 60: | Line 60: | ||
** Offline Monitoring | ** Offline Monitoring | ||
** Calibration [[December 17, 2014 Calibration| December 17, 2014]] | ** Calibration [[December 17, 2014 Calibration| December 17, 2014]] | ||
− | * Physics Analysis | + | * Physics Analysis [[January 12, 2015, Physics Working Group|January 12, 2015]] |
− | + | * | |
=== Other Activities === | === Other Activities === |
Revision as of 10:32, 19 January 2015
Contents
Meeting Time and Place
The meeting will be on Wednesday January 21, 2015 at 11:15am EDT. For those people at Jefferson Lab, the meeting will be in room F326.
Meeting Connections
- To join via a Web Browser, go to the page [1] https://bluejeans.com/660743227.
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 660743227.
- To join via phone, use one of the following numbers and the Conference ID: 660743227.
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- Upon connection all microphones are automatically muted. To unmute your mike on a Polycom or equivalent unit, enter *4. Unmuting on a computer is trivial as there is a microphone button than can be clicked.
- More information on connecting to bluejeans is available.
Agenda
Announcements
- Collaboration Meeting
- Accelerator Schedule Update
- Shift Schedule
- Software Review 3 February 10-11 at JLab
Run Planning for Spring 2015
- Run Plan
- New Equipment
- Shift Schedule
Detector Updates
- Engineering Activities
- Target
- Magnets
- Electronics Activities
- Other Activities
- Beamline Status January 5, 2015
- Active Collimator
- Pair Spectrometer
- Hodoscope
- Microscope
- Diamonds
- Polarimeter
- Start Counter December 12, 2014
- Tracking Joint FDC/CDC Meeting January 15, 2015
- CDC
- FDC
- FADC FPGA December 9, 2014
- Calorimeters: December 18, 2014
- FCAL
- BCAL
- BCAL Reconstruction December 12, 2014
- TOF January 13, 2015
- Online Systems
- Level-1 Trigger Status
- Controls
- DAQ
- Monitoring
- Offline Activities December 10, 2014
- Software Status
- Data Challenge 3
- Offline Monitoring
- Calibration December 17, 2014
- Physics Analysis January 12, 2015
Other Activities
- PID Upgrades August 29, 2014
- Software (Level-3) September 2, 2014
- Technical Construction Report
- AOT