* [[GlueX-Collaboration-Oct-2014|Collaboration Meeting]] October 2-4, 2014
 
* [[GlueX-Collaboration-Oct-2014|Collaboration Meeting]] October 2-4, 2014
 
* Solenoid
 
* Solenoid
 +
* [http://www.jlab.org/exp_prog/PACpage/PAC42/PAC42_FINAL_Report.pdf PAC 42 Report]
  
 
=== Running in Fall 2014 ===
 
=== Running in Fall 2014 ===
Line 29: Line 30:
 
** Analysis Coordinator - Volker Crede or designate from Physics group
 
** Analysis Coordinator - Volker Crede or designate from Physics group
 
* Plans
 
* Plans
** [https://hdops.jlab.org/wiki/index.php/Fall_2014_Commissioning_Plan Commissioning Plan]
+
** [https://halldweb.jlab.org/hdops/wiki/index.php/Fall_2014_Commissioning_Plan Commissioning Plan]
** [https://hdops.jlab.org/wiki/index.php/Offline_Analysis_Commissioning Offline Analysis Plan]
+
** [https://halldweb.jlab.org/hdops/wiki/index.php/Offline_Analysis_Commissioning Offline Analysis Plan]
** [https://hdops.jlab.org/wiki/index.php/Hall_D_Commissioning Detector-specific Commissioning]
+
** [https://halldweb.jlab.org/hdops/wiki/index.php/Hall_D_Commissioning Detector-specific Commissioning]
 
** [[August 13, 2014 Calibration|Calibration Plans]] (discussed below)
 
** [[August 13, 2014 Calibration|Calibration Plans]] (discussed below)
 
* Manpower
 
* Manpower
Line 40: Line 41:
 
* Technical Construction Report
 
* Technical Construction Report
 
** [https://userweb.jlab.org/~gen/tcr.pdf TCR Report]
 
** [https://userweb.jlab.org/~gen/tcr.pdf TCR Report]
**[https://halldweb1.jlab.org/wiki/index.php/StatusTable TCR Status]
+
**[https://halldweb.jlab.org/wiki/index.php/StatusTable TCR Status]
* [[Solenoid Current Studies]]
+
** [https://www.dropbox.com/s/0p1iuhpnc4ialzu/GlueXCurrentStudies.xlsx?dl=0 Excel File]
+
  
 
=== Reports from Technical Groups ===
 
=== Reports from Technical Groups ===
* Calorimeters: [[Aug 14, 2014 Calorimetry | August 14, 2014]]
+
* Calorimeters: [[Aug 28, 2014 Calorimetry | August 28, 2014]]
 
** FCAL
 
** FCAL
 
** BCAL - [https://logbooks.jlab.org/book/hdbcal BCAL Logbook]
 
** BCAL - [https://logbooks.jlab.org/book/hdbcal BCAL Logbook]
** BCAL Reconstruction [[BCAL Reconstruction Meeting 2014-08-07| August 7, 2014]]
+
** BCAL Reconstruction [[BCAL Reconstruction Meeting 2014-08-21| August 21, 2014]]
* Tracking [[Minutes-8-14-2014|Joint FDC/CDC Meeting August 14, 2014]]
+
* Tracking [[Minutes-8-28-2014|Joint FDC/CDC Meeting August 28, 2014]]
** CDC [https://logbooks.jlab.org/entry/3291616 Curved Tracks] 650A Solenoid Current
+
** CDC  
** FDC [http://www.jlab.org/Hall-D/detector/fdc/DAQ/run126_ext1_ev2673_2.pdf scattering event], [http://www.jlab.org/Hall-D/detector/fdc/DAQ/run127_ext2_ev3355_2.pdf horizontal shower event]
+
** FDC  
** FADC FPGA [[FADC_Data_Format_August_19,_2014 |August 19, 2014]]
+
** FADC FPGA [[FADC_Data_Format_September_2,_2014 |September 2, 2014]]
 
* PID  
 
* PID  
** TOF [[GlueX TOF Meeting, August 12, 2014|August 12, 2014]]
+
** TOF [[GlueX TOF Meeting, September 2, 2014|September 2, 2014]]
***[ https://logbooks.jlab.org/entry/3289258 Logbook entry of TOF cosmic trigger]
+
** Start Counter [[GlueX Start Counter Meeting, August 21, 2014#Minutes|August 21, 2014]]
** Start Counter [[GlueX Start Counter Meeting, July 24, 2014#Minutes|July 24, 2014]]
+
*** [http://gluex.phys.uregina.ca/content/photo/completed-start-counter-fiu Start Counter]
** PID Upgrades [[August 15, 2014 PID Upgrade|August 15, 2014]]
+
** PID Upgrades [[August 29, 2014 PID Upgrade|August 29, 2014]]
* DAQ/Monitoring/Controls [[OWG Meeting 30-Jul-2014 |July 30, 2014]]
+
* DAQ/Monitoring/Controls [[OWG Meeting 13-Aug-2014 |August 13, 2014]]
 
* Engineering  
 
* Engineering  
 
** Magnets
 
** Magnets
Line 66: Line 65:
 
* Electronics
 
* Electronics
 
* Trigger  
 
* Trigger  
** Hardware (Level-1) [[OWG Meeting 30-Jul-2014 |July 30, 2014]]
+
** Hardware (Level-1) [[OWG Meeting 13-Aug-2014 |August 13, 2014]]
 
**: [https://logbooks.jlab.org/entry/3289258 TRIGGER logbook]
 
**: [https://logbooks.jlab.org/entry/3289258 TRIGGER logbook]
** Software (Level-3) [[June 10, 2014| June 10, 2014]]
+
** Software (Level-3) [[September 2, 2014| September 2, 2014]]
 
* Offline Software  
 
* Offline Software  
** Offline [[GlueX Offline Meeting, August 6, 2014|August 6, 2014]]
+
** Offline [[GlueX Offline Meeting, August 20, 2014|August 20, 2014]]
** Calibration [[August 13, 2014 Calibration| August 13, 2014]]
+
** Calibration [[August 27, 2014 Calibration| August 27, 2014]]
 
* Photon Beam and Tagger [[BLTWG Meeting 08/18/2014|August 18, 2014]]
 
* Photon Beam and Tagger [[BLTWG Meeting 08/18/2014|August 18, 2014]]
* Physics [[August 11, 2014, Physics Working Group|August 11, 2014]]
+
* Physics [[August 25, 2014, Physics Working Group|August 25, 2014]]
 +
** [[Solenoid Current Studies]]
 +
** [https://www.dropbox.com/s/0p1iuhpnc4ialzu/GlueXCurrentStudies.xlsx?dl=0 Excel File]

Latest revision as of 17:54, 31 March 2015

Meeting Time and Place

The meeting will be on Wednesday September 3, 2014 at 11:15am EDT. For those people at Jefferson Lab, the meeting will be in room F326.

Meeting Connections

  1. To join via a Web Browser, go to the page [1] https://bluejeans.com/660743227.
  2. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 660743227.
  3. To join via phone, use one of the following numbers and the Conference ID: 660743227.
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. Upon connection all microphones are automatically muted. To unmute your mike on a Polycom or equivalent unit, enter *4. Unmuting on a computer is trivial as there is a microphone button than can be clicked.
  5. More information on connecting to bluejeans is available.

Agenda

Announcements

Running in Fall 2014

Ongoing Activities

Reports from Technical Groups