Difference between revisions of "2014-09-03"
From GlueXWiki
(→Reports from Technical Groups) |
(→Reports from Technical Groups) |
||
Line 52: | Line 52: | ||
** CDC | ** CDC | ||
** FDC | ** FDC | ||
− | ** FADC FPGA [[ | + | ** FADC FPGA [[FADC_Data_Format_September_2,_2014 |September 2, 2014]] |
* PID | * PID | ||
** TOF [[GlueX TOF Meeting, September 2, 2014|September 2, 2014]] | ** TOF [[GlueX TOF Meeting, September 2, 2014|September 2, 2014]] | ||
** Start Counter [[GlueX Start Counter Meeting, August 21, 2014#Minutes|August 21, 2014]] | ** Start Counter [[GlueX Start Counter Meeting, August 21, 2014#Minutes|August 21, 2014]] | ||
*** [http://gluex.phys.uregina.ca/content/photo/completed-start-counter-fiu Start Counter] | *** [http://gluex.phys.uregina.ca/content/photo/completed-start-counter-fiu Start Counter] | ||
− | ** PID Upgrades [[August | + | ** PID Upgrades [[August 29, 2014 PID Upgrade|August 29, 2014]] |
− | * DAQ/Monitoring/Controls [[OWG Meeting | + | * DAQ/Monitoring/Controls [[OWG Meeting 13-Aug-2014 |August 13, 2014]] |
* Engineering | * Engineering | ||
** Magnets | ** Magnets | ||
Line 66: | Line 66: | ||
* Electronics | * Electronics | ||
* Trigger | * Trigger | ||
− | ** Hardware (Level-1) [[OWG Meeting | + | ** Hardware (Level-1) [[OWG Meeting 13-Aug-2014 |August 13, 2014]] |
**: [https://logbooks.jlab.org/entry/3289258 TRIGGER logbook] | **: [https://logbooks.jlab.org/entry/3289258 TRIGGER logbook] | ||
− | ** Software (Level-3) [[ | + | ** Software (Level-3) [[September 2, 2014| September 2, 2014]] |
* Offline Software | * Offline Software | ||
− | ** Offline [[GlueX Offline Meeting, August | + | ** Offline [[GlueX Offline Meeting, August 20, 2014|August 20, 2014]] |
− | ** Calibration [[August | + | ** Calibration [[August 27, 2014 Calibration| August 27, 2014]] |
* Photon Beam and Tagger [[BLTWG Meeting 08/18/2014|August 18, 2014]] | * Photon Beam and Tagger [[BLTWG Meeting 08/18/2014|August 18, 2014]] | ||
− | * Physics [[August | + | * Physics [[August 25, 2014, Physics Working Group|August 25, 2014]] |
Revision as of 21:36, 2 September 2014
Contents
Meeting Time and Place
The meeting will be on Wednesday September 3, 2014 at 11:15am EDT. For those people at Jefferson Lab, the meeting will be in room F326.
Meeting Connections
- To join via a Web Browser, go to the page [1] https://bluejeans.com/660743227.
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 660743227.
- To join via phone, use one of the following numbers and the Conference ID: 660743227.
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- Upon connection all microphones are automatically muted. To unmute your mike on a Polycom or equivalent unit, enter *4. Unmuting on a computer is trivial as there is a microphone button than can be clicked.
- More information on connecting to bluejeans is available.
Agenda
Announcements
- Accelerator Readiness Review August 26-28, 2014
- Collaboration Meeting October 2-4, 2014
- Solenoid
Running in Fall 2014
- Coordination
- Run Coordinator - Alexandre Deur
- Physics Division Liaison - Yi Qiang
- Shift Scheduler - Reinhard Schumacher
- Analysis Coordinator - Volker Crede or designate from Physics group
- Plans
- Manpower
- Shift Schedule site available.
- Schedule October now.
Ongoing Activities
- Technical Construction Report
- Solenoid Current Studies
Reports from Technical Groups
- Calorimeters: August 28, 2014
- FCAL
- BCAL - BCAL Logbook
- BCAL Reconstruction August 21, 2014
- Tracking Joint FDC/CDC Meeting August 28, 2014
- CDC
- FDC
- FADC FPGA September 2, 2014
- PID
- TOF September 2, 2014
- Start Counter August 21, 2014
- PID Upgrades August 29, 2014
- DAQ/Monitoring/Controls August 13, 2014
- Engineering
- Magnets
- Target
- Engineering Activities
- Installation
- Electronics
- Trigger
- Hardware (Level-1) August 13, 2014
- Software (Level-3) September 2, 2014
- Offline Software
- Offline August 20, 2014
- Calibration August 27, 2014
- Photon Beam and Tagger August 18, 2014
- Physics August 25, 2014